Middle Tier of Acquisition (MTA)

Breadcrumb

  1. Home
  2. About AAFDID
  3. Middle Tier of Acquisition (MTA)

Middle Tier of Acquisition (MTA)

INFORMATION REQUIREMENT

SYSTEM TYPE

SUBMISSION DUE

SOURCE

TYPE

NON-MAJOR SYSTEMS1

MAJOR SYSTEMS2

EXCEEDS MDAP THRESHHOLD3

Acquisition Strategy, to include – security, schedule, technical, and production risks; a test strategy or an assessment of test results with validation of required cybersecurity and interoperability as applicable4; and a transition plan...

 

x

x

At MTA Program Entrance

​DoDI 5000.80; DoDI 5010.44

Regulatory

ADM signed by the DA

x

x

x

At MTA Program Entrance

​DoDI 5000.80

Regulatory

Approved Requirement

 

x

x

At MTA Program Entrance

​DoDI 5000.80

Regulatory

Cost Estimate5

 

x

x

At MTA Program Entrance

​DoDI 5000.80; DoDI 5000.73

Regulatory

Initial PID Entry

x

x

x

At MTA Program Entrance

​DoDI 5000.80

Regulatory

Lifecycle Sustainment Plan

 

x

x

At MTA Program Entrance

DoDI 5000.80; DoDI 5000.91

Regulatory

Written decision by USD(A&S)

 

 

x

At MTA Program Entrance

​DoDI 5000.80

Regulatory

Updated PID Entry

x

x

x

Throughout MTA Program Execution

​DoDI 5000.80

Regulatory

An assessment of test results

x

x

x

At MTA Program Exit

​DoDI 5000.80

Regulatory

Final PID capturing updated entries, to include the outcome, sustainment, and final budget of the MTA program

x

x

x

At MTA Program Exit

​DoDI 5000.80

Regulatory

Outcome determination ADM signed by the DA

x

x

x

At MTA Program Exit

​DoDI 5000.80

Regulatory

Table Notes:

1 Equal to or below threshold as defined in Section 3041(c) and 4202(b) {formerly 2302d} of Title 10, U.S.C.

2 Above threshold as defined in Section 3041(c) and 4202(b) {formerly 2302d} of Title 10, U.S.C.

3 Defined in Section 4201 and 4202 {formerly 2430} of Title 10, U.S.C.

4 For initial submission, can use test strategy in lieu of assessment of test results if testing is not complete. For programs that are on the DOT&E oversight list, additional documentation may be required.

5 Per 5000.73: CAPE will conduct an estimate of life-cycle costs for programs likely to exceed ACAT I threshold pursued using the MTA rapid prototyping pathway. CAPE will conduct an estimate of life-cycle costs for programs likely to exceed ACAT I or II thresholds pursued using the MTA rapid fielding pathway.