Sign In
DAU Menu
DAU Home
Training Center
Course Login
iCatalog Home
 Continuous Learning
 Functional Gateways
 Get College Credit
Online Resources
 Defense ARJ
 Communities
 Defense Acq Magazine
 Library
Industry Support
 Tools
 Videos
Mission Assistance
Policy Browser
DAU Locations
News
Events
DAU Webcasts
FAQs
About DAU
Customer Support
Menu
Operating Status
FULLY OPERATIONAL
Apply for a Course
Course Login
Class Locator
This Site
All DAU
OPERATING STATUS
FULLY OPERATIONAL
Turn on more accessible mode
Turn off more accessible mode
Ask a Professor
Sign In
DOD Civilian salary
(ECMRA)
5 day verification compliance of release/obligation of funds after the contract has been signed
52.212-4 and 52.246-2
52-237-3 Continuity of Services
Adding an ELIN for an Exisiting IDIQ portion of BOS Contract
Applications of Models and Simulation in the DoD Acquisition Life Cycle
Applications of Models and Simulation in the DoD Acquisition Life Cycle
Are CORs authorzied to disapprove or approve individual contractor employee and subcontractor employee Leave Requests prior to them being submitted to the Contractor for processing
best value
BPAs
Buying A&E contractors on GSA for specific projects.
Can FAR 8.405 6 b 2 be used for GSA limited sole source when only 1 responsive RFQ?
Capability Production Document CPD for NonDevelopmental Items
Commercial contract
Computer Network Defense Service Provider for closed systems
Costs that Profit/Fee are allowed
CPIF Contract Type Determination and Finding
DA Pam 700-50
Environmental testing early on
Evaluating a Joint Venture for source selection purposes
FFP-LOE payment
General Fund Enterprise Business System
GPC 25K Commercial Training Card
Integrated Logistics Support Plan (ILSP)
Is it mandatory to do COR nomination memo for every task order if the COR has been appointed to the base contract?
Level of Repair Analysis - Data Item Description
Life cycle cost for tents, and shelters
Looking for Functional Strategies to align DBS CRD with BEA
Multiple Award 8a IDIQ
Normal and Routine preventative maintenance
Post CDR MDA Assessments
Preliminary Design Review
Purchase of Pyrotechnics for Wildlife Dispersal using the GPC
Quarterly Limitations of Payments required for a signle delivery item
Refrigerators
Service or Supply
Ship to address in WAWF/iRAP for FMS shipments
Site activation plan
Six Sigma
SOW and PWS
SRD Code in line 7D of the AF1067
Sustainment, Items to Purchase and SAPM Responsibilities
Timing for Awarding New contract Prior to End of Performance
Two different fee percentage use din rfp
Unclassified notice of the solicitation
Wage Grade Pay Scale 2011
What is the Regulatory Authorization to allow estmated costs for termination Inventory schedules?
WiFi access cards for air travel
0422
1 requirement on GSA split between two different vendors;
1. Modifying a CPD to add capability 2. Make it from Component to Joint Interest
1. Setting aside using FAR Part 8 2. Difference between commercial item and COTS item
10 U.S.C. 2306a vs. TINA Threshold
10 Year BPA
100 PERCENT SMALL BUSINESS SET ASIDE
1105 Series verses 1102 Series
12 month contract
1279 Report needed or not
12b. ESTIMATED COST TO COMPLETE on SF1443
1391 Revisions after appropriation
1449 to 1155
1910s as CORs
2 contracts same FY 16 months of service
2 of a Kind Use of Socio-Economic Programs
2 part numbers assigned the same NSN, what process ensures same function
2 SDVOSB RESPONSES
2 year funds
2.2S Storage
2/24/2011 Memo Expected Business Practice: Post-Critical Design Review Reports and Assessments
2010 Below Threshold Reprogramming Authority
2016 NDAA ACQUISTION CHANGES - DAU SUMMARY BRIEF AVAILABLE
2016 NDAA Change Summary Brief in light of the current moritorium on Federal Regulations.
2018 TDP Option Selection Worksheet
20-year service life
22 Percent G&A applied to Travel Costs
2366a/b CERTIFICATION
25 Percent Increase
25 percent Rule for Contract Modification
25,000 non-training GPC
252.209-7993 Class Deviation 2014-O0009
252.215-7010 Alternate I usage
2579 Concurrence
2579 Spiral 3
2579s and modifications to a contract or order
2597
2-Phase LPTA
3 month average CPI calculation
3 quotes under micro-purchase threshold
30 day or monthly purchase threshold per vendor with the GPCC
3010 dollars
3011 Funding, 250K Rule
3020 Funds
3023 Other Procurement appropriation funds
3080 procurement dollars used for organic travel
3400 Money
3600 funding under UCA
3600 RDT&E Budget Appropriations
3-in-1 tool to replace SF44?
3rd party logisitics center
4PL
4pl waivers
5 year IDIQ or BPA against an FSS IDIQ
5 year limit on DOD IDIQ contracts. DFARS 217.204(e)(i)
5 year ordering period, without optioned out years, on IDIQ contracts
50% Rule application on TOs
50/50 depot level reporting
508
51 percent of what when partnering?
51 percent rule
51 percent rule
5101.602-2 -- Responsibilities.
52.204-7 System for Award Management
52.207-5 Option to Purchase Equipment.
52.211 Clause is Reserved so what now?
52.212-4(c)
52.212-4(c)
52.212-4(c)
52.212-5 vs 52-212-5 Deviation 2013-O0019
52.214-10
52.215-23 Limitations on Pass-through Charges
52.216-16 Incentive Price Revision - Firm Target Oct 97.
52.216-2 -- Economic Price Adjustment -- Standard Supplies
52.217.8
52.217-8 Option to Extend Services
52.217-9 "within" versus "at least"
52.219-9
52.225-1 or 52.225-13 in a commercial contract for rental supplies ?
52.228-4 -- Workers Compensation and War-Hazard Insurance Overseas
52.232-2 -- Payments Under Fixed-Price Research and Development Contracts
52.236-1, Post Award Administration of
52.236-22 Design Within Funding Limitations
52.237-7 -- Indemnification and Medical Liability Insurance
52.243.3 Changes Time and Materials or Labor Hours
52.244-2 Consent to Subcontract
52.245-1
52.246-4 on commercial item
5232.903 DFARS 232.903 Responsibilities
6 month Option Extensions- Purpose
6 Percent Design Costs for FFP/IDIQ MACC Construction
6 percent Design Fee for Govt. In House Design Efforts
6 stages of acquisition
6.3 funding for Base CE
60 Month BPA
7 year PoP contract, base plus 6 option years
703-336-4069
8 (a) program
8 clause and or use of DFARS subpart 217.74 UNDEFINITIZED CONTRACT ACTIONS UCA
-8 Extension of a TO when the base and TO are about to expire.
8(a) / Small Disadvantaged Business (SDB) Certification
8(A) Contracting
8(a) Program Graduation Date impact on acquisition timeline
8(a) Solicitation Development
8.004 Contract Clause
8a Award - Can PoP Extend Beyond Program Exit Date
8a Awards
8a awards and the GPE
8a Competitive question
8a contract descoping
8a direct award
8a Eligibility
8a Eligibility for Sole Source Contract under FAR 19.8
8a Joint Venture with its Large Mentor
8a low dollar value requirement - cognizant competition advocate
8a or not 8a
8a Program and SAT Acquisition
8a Program Price Determination
8a Set Aside on GSA
8a sole source awards above 25,000 dollars
8a Sole Source Cost and Pricing Data Requriement
8A SOLE SOURCE FIRM NEARING CERT EXPIRATION
8a sole source for Design Build Construction Contracting?
8a sole source task order
8a Sole Source/Direct Award
8a STARS
8a vs. Ability One or Source America
95 Percent Quantity Variance Line
A 16 year old mod contains an error
A and A S Performance Based PWS Information
A and E Contracts
A BASE WITH TWO OPTIONS
A good SOW example?
A NSP CLIN for Contractor Incentive
A quantity of prototype for testing of ammunition dispersion
A RAD after a RAD?
A subcontractor of prime is currently asking for Bond information for the contract
A&E Title I, II, III Services Definition reference
A/E DESIGN FEE AND STUDIES
A/E IDIQ Contracts and Task Orders
A/E IGE Requirement
A/E Proposals
A/V installation On CHESS?
AAFES Contracts
AAFES customer POV fuel contract--supply or service?
AAO
AAO increase after fielding decision
AAO vs. AAO
AAP Email Notifications
AAP Process to Publish on Govt Website
Abandonment of Govt Property on Military Installation?
Abandonment of Property
Abbreviated Acquisition Program Documentation
Abbreviated Acquisition Program versus Accelerated Acquisition Program
Abbreviated System Decision Paper (ASDP)
Ability One
Ability One
Ability One Contract
Ability one FMP Cost Analysis CNA FEE
Ability One Mandatory Source
Ability One Sole Source
Ability ONE vs Service Disabled Veteran owned small business
AbilityOne
Abilityone
AbilityOne Contract Award Publicizing
AbilityOne, Randolph-Shepard Act Service Contract Renewal
Able to Contract for ACFT Equipment
Abount USFK Form 173-R
Above Threshold Reprogramming - guidance and timelines
Abreviated Acquisition Program AAP
Absorbing Credits into the Contract versus Contractor Refunding Government
ABSS vs. DEAMS
Abstract - Successful Offerors
Abstract note
ACAT 1 and Risk Rating
ACAT 1 threshold and required documents
ACAT Catagory Procurement Cost
ACAT change
ACAT CLASSIFICATION AND AQUISITION PLAN
ACAT I AM MAIS Software Requirements
ACAT I Calculation
ACAT I Threshold
ACAT I Transition Timeline of Events, Requirements and Documentation
ACAT ID Systems Engineering requirements for Mile Stone B and C
ACAT III
ACAT III acceptance
ACAT III LCSP Guidance
ACAT III Need for formal BCA
ACAT III Operational Testing
ACAT III USN Document Templates
ACAT IV Program
ACAT IVT Designation
ACAT Levels and Increments
ACAT Levels and Research and Development Budget Activities
ACAT vs Services Designation
Accelerate Option Year
Accelerated Advancement Programs
Acceptability of ORCA Reps and Certs
Acceptable leave of corrosion on a 155mm.
Acceptance of Contractors proposal for the purposes of award
Acceptance of items of value by government
Acceptance of LRIP Articles & Temporary Storage at Contractor Location
Acceptance of LRIP Articles & Temporary Storage at Contractor Location
Acceptance of LRIP Articles & Temporary Storage at Contractor Location
Acceptance of services by an authorized representative of the Government
Accepting a CAT II MIPR direct cite
Accepting Contract award
Accepting Contractor Test Reports
Accepting funds via FAD
Accepting Late Quotations
Accepting-inducting material into PBL-O
Acces to a consolidated list of requirements
Access to DAISY
Access to scientific journals
Accommodation procurements
Accomplish the acquisition
According to the DAU CBT, all credit cards must be reissued for new AO
Accountability
Accountable Navy Property Inventory Systems
Accounting and Appropriation Data
Accounting Fees for for Tax Equalization
Accounting for Proposal Costs
Accounting System Review
Accounting System--Impact on Change Negotiation
Accredited Models and Simulations
ACE College Credit Recommendation
ACE OFFICE Use
Acknowledging Amendments on FAR 15 Construction Solicitation
ACO appointments to Serivce Contracts
ACO authority
ACO Authority to Issue Blanket Authorization of GFP
ACO cannot sign a DD250? PCO authirzation of payment has to be a bilateral Mod?
ACO Consent for Subcontract Quick Closeout
ACO Limitation on further delegations
ACO Modification
ACO responsibilities
ACO vs. Contracting Officer
ACO Warrant
ACQ policy and procurment
Acquiring and obtaining access to data created during the performance of a contract
Acquiring Title to Residual Invnetory under an FPIF contract
Acquisition and Budgeting Timelines
Acquisition and Cross-Servicing Agreement
Acquisition Business Case
Acquisition Costs
Acquisition Documentation Approval Post-FRP Decision
Acquisition documents
Acquisition Ethics Equivalency - CLM 003
Acquisition Milestones
Acquisition of Commercial Items
Acquisition of General Purpose Tools
Acquisition of Materials not in scope of present J&A
Acquisition of test and evaluation infrastructure for Major Range Test Facility Bases
Acquisition of Utility Services - Are Contracts Contracts for Services (FAR Part 37)
Acquisition Operations and Maintenance Prior to IOC or MSC
Acquisition Operations and Support Cost and Program Aquisition Unit Cost
Acquisition Package Checklist
Acquisition Phases and ACAT categories renaming?
Acquisition Plan
Acquisition plan
Acquisition Plan Contents under Plan of Action
Acquisition Plan Required when Contract is Modified
Acquisition Plan Validity on Major Weapon Systems
Acquisition Planning
Acquisition Plans for Task Orders
Acquisition Process
Acquisition Professional
Acquisition Program Baseline Thresholds APB
Acquisition Program Transition Workshop
Acquisition Programs that are part of a new aircraft carrier Program
Acquisition Query
Acquisition Reform
Acquisition Reform and CON 200
Acquisition required signatures for PDs, CDs and FRDs.
Acquisition Requirement for JCIDS documentation
Acquisition Requirements Package Re-Approval
Acquisition Security Database ASDB
Acquisition Specialist
Acquisition Strategy
Acquisition Strategy
Acquisition Strategy - usage for Services
Acquisition Strategy - when is it required and when is it not required
Acquisition Strategy - when is it required and when is it not required
Acquisition Strategy and Acquisition Plan Training
Acquisition Strategy Change Pages and Updates
Acquisition strategy for COTS
Acquisition Strategy for IDIQ with CPFF and FFP Type Task Orders
Acquisition Strategy report
Acquisition Strategy vs Acquisition Plan
Acquisition Strategy/Plan validity time period.
Acquisition Value in PCARSS
Acquistion Advise Codes
Acquistion Dvision Set Up
Acquistion workforce human capital standard
Acqusitiion Decision after OT
Acqusition Plan or Strategy
Acqusition Status
Acqusition Strategy
Acronym unknown
Acronyms
Acronyms
Acronyms specific to Acquisition/Program Management in DoD
Act of God or Diffiering Site Condition
Action Code listed in FAR 5.207
Active Risk Manager Accounts for Prime Contractors
Active/Inactive ACAT Program Determination
Activity Manpower Document
ADA Violation and Ratification
ADA Violations
ADA Violoation?
Add 12 months past the POP to a CPFF service contract
Add a Fixed Rate to a Cost Reimbursable CLIN
Add an incentive to a FFP
Add DFARS Clause 252.242-7005
Add expected work to a PWS?
Add FAR 52.217-8 after award to a sole soure contract
Add Quantities to an Already Exercised Option
Add/Delete Proposal
Addedum for FAR 52.212-4
Addendum vs Amendment
Adding a CLIN that crosses Fiscal Years
Adding a Travel CLIN to a Task Order
Adding additional clauses in delivery orders that are not on the basic contract
Adding Additional Fee to a Cost Plus Fixed Fee Contract
Adding CLIN and Funding to Cover Contract Closeout Effort
Adding Contract Clause after award
Adding funding from a 9L
Adding Funds to a CPAF Contract to Accelerate Work
Adding funds to a definitized contract
Adding GFP to a contract through modification
Adding Incremental Funding Clause After an Award
Adding Invoice Funding After the Period of Performance End
Adding items to an existing contract
Adding Labor Categories to an awarded IDIQ
Adding labor categories to existing IDIQ which was fully competed and labor categories were already provided in the solicitation
Adding New Printers to Contract
Adding New Wage Deteriminations to 5 Year Construction Contract With No Options
Adding new work to sole source 8a contract
Adding options periods to a contract
Adding Options to Awarded Contracts
Adding Sub CLINS to Delivery Orders
Adding Within Scope Work To IDIQ
AddingClauses
Additional Assignments of ACAT I personnel
Additional FTE = 46 percent increase
Additional Hours on a CPFF
Additional question Title - Is the Government bound to any/all of what a vendor quote says?
Additional requirements to an OMA funded project
Additional Resources to help with performing the Competition Adovocate duites
Additive and Deductive Bid Items
Additive Manufacturing -3D Printing- and Intellectual Property Rights
Additive or deductive items
Adequate accounting system required??
Adequate Accounting System VS. Acceptable
Adequate Competition FAR 15.403-1(c)(1)(C)
Adequate Price Competition in LPTA Source Selections
Adjudication Sub-Process
Adjustment or New Requirement?
ADM to use 3600 funds?
Admin Surcharge
Administering SPA Delegation to a Sub-Tier GPA
Administrative change
Administrative Closeout without any Supporting Documentation
Administrative Contract Closeouts
Administrative Costs
Administrative Modification after Task Order Expiration
Adopting Other Service Capabilities
Advance payments
Advance Payments for Annual Software Updates and Hardware Maintenance?
Advance Procurement Planning
Advance Procurerment Funds before Milestone C
Advance proucuement of maintenance
Advanced Acquisition Contract
Advanced Electronic Testing
Advanced, Emerging, and Obsolete Technologies
Advertisement
ADVERTISING ON SOCIAL MEDIA
Advisory and Assistance Length of Service
Advisory and Assistance Services
Advisory and Assistance Services (A&AS)
Advisory and Assistance Services- Can contractor bill for entire month of service
Advisory and Assistance Services--Support in a FFP environment
Advisory and Assistance vs. Consulting Services
A-E
AE Allowable, Reasonable, Allocable
AE and computing Brookes Act 6 percent.
A-E Combined synopsis/solicitation
AE Contract - Request for Proposal
AE contract claims
A-E Contracting
AE Contracts/Task Orders
A-E Debriefings, Can the number of SF 330s submitted and evaluated be revealed to firms
A-E Designed construction project
A-E Funding
AE Handling Fee for Subcontractor Management
AE IDIQ Contract/Cumulative dollar limit
AE IDIQ Option Pricing
AE IDIQ UTILIZATION REQUIREMENT
AE Liability
AE not performanced based
A-E Partial Set-Aside
AE Post Award Debriefing
AE PWS or SOW?
AE Rates Modification
A-E s Proposal/Negotiation on Travel
AE Services Titles I II and III Referencing
A-E Set-Asides
AE SOLICITATION QUALIFICATION
AE storage in a safe
AE Subcontractor Pricing
AE Type C Inspection Services
AF 1067 Rescinding Process
AF 3000 vs SOW
AF CSRD Need? Only true IT? Netcents2?
AF form 1067
AF Form 1297
AF Form 9
AF System End of Life Cycle Plan questions and template
AF System Safety Manager Training?
AF1067 DOC or PDF
AF3000 approval binding power
Affect of Heat and Humidity on the shelf life of Repair Parts
Affect on CCD for a Partial NTP Issuance?
Affiliates
Affiliation based on Joint Ventures
Affordability and Price Analysis Techniques
AFI 63-101
AFI 63-124 Obsolete
AFIT and FAI Contract Pricing Reference Guide, Vols 1-5
AFMC IMT Form 8
AFPAM 32-1125 V1
After contractor repaired roof, it leaked and damaged computer inside building.
After The Fact Awards
After the Fact Payment
After the fact payments
AFWAY Purchase
Agencies vs Activities
Agency FAR Supplement
Aggregating TINA Requirement by Supplier
Agile Development or Compliance w/ AF Directives/Instructions?
Agile integration into SETR events
Agile process
Agile Software Factories
Aging and surveillance
Aging and Surveillance Responsibility
Agreements between Services
Agregating the amounts of multiple LSJ or JOFOC
Air Condition replacement.
Air Force Acquisition Mast List
Air Force Program Priority Levels
Air Force Service Contract Labor Standards Price Adjustment Guide
Air Handler Unit and Commercial Items being attached to real property
Aircraft engine related maintenance plan
Aircraft Maintenance Contract - Tools as GFP?
Aircraft public and passenger liability
Aircraft Wash Water Testing
Airshow
Alaska Native Corporation use in foreign location
Alaskan Native Corporation Awards
Algorithm Description Document
All bonuses charged to the G & A pool
ALL FINDINGS AND/OR RESULTS?
Allocated Baseline typical contents
Allocation of Indirect Support Costs
Allocation of Intercompany Costs
Allowability of community service costs
Allowability of company risk released costs / work continuation during Stop Work
Allowability of contractor building signage
Allowability of Corporate Jet
Allowability of Costs beyond Delivery Date on FPI
Allowability of Depreciation on Self-Constructed Assets Partially Reimbursed with State Grant Funds
Allowability of Domestic Tradeshows and Related Costs
Allowability of Fee
Allowability of Income Tax Differential Pay
Allowability of insurance costs for insurance against unallowable costs not being reimbursed
Allowability of Loss Damage Waiver and Theft Insurance?
Allowability of lunch cost for an engineering meeting
Allow-ability of Offsets and FMS Cost Allocations to USG contracts
Allowability of Unofficial Offset Activities
Allowability to Lower Qualifications Standards of Contractor Personnel after Contract Award
Allowability/Allocability of Costs Associated with Definitization of a UCA
Allowable charges
Allowable charges for parent assistance to subsidiary
Allowable Contractor Email Address, Commercial vs Business Email Address
Allowable Cost?
Allowable costs
Allowable Costs
Allowable costs: Training definition for overtime for training
Allowable for Contractor to Purchase Material for Government to Install
Allowable NEW on farp pads and arming pads
Allowable overseas employee reimbursable expenses on contract
Allowable Quantities in an IDIQ Contract
Allowable Travel Costs to return to home.
Allowances in Government Contracting
Allowing for de-escalation
Allowing for Payment of Mobilization Costs
Alter DFARS 252-234.7002, EVMS
Alteration versus Construction
Alternate Billing Official
Alternate Form provided to show Payment Bond Rate
Alternate Liquidation Rates
Alternate release procedure
Alternate Release Procedure
Alternate vs Main
Alternate way to get copies of related DIA documents
Alternates I, II, III, IV, V......
Alternates to EVM
Alternative Course of Action
Alternative Payment Use Clause 52.228-13 FFP Construction
Although requested in the proposal, some offerors accidently omitted Section K
Am I allowed to award a short duration sole source contract while preparing a solicitation for a competitive task order award?
Am I required to use UCF when issuing a MAC IDIQ request for task order proposal?
Amazon and Other Third Party Vendors
Amazon Purchasing- Continuation
Ambiguous Spec Revision
Amend a Closed Solicitation
Amend Economy Act MIPR to be Project Order MIPR
Amending a Justification and Approval After Issuance of the Out-of-Scope Modification
Amending a Justification and Approval post award
Amending a Solicitation for Construction/Installation to Now Include the Equipment
Amending an Acquisition Plan
Amending an RFQ after Receipt of Quotes to include DFARS 252.225-7020 and DFARS 252.225-7021
Amending IFB to change bid opening date
Amending solicitations after due date for submission of quotes
Amendment to correct the requirement on SOW after RFP submissions have been received and deadline of offers has expired?
Amendments After Solicitation Closing
AML
AML vs IML documents required?
AMMO
Ammo 62 Certification
AMMO 62 refresher course
Ammo 67 or LTC- 012
Ammo Data Card Inspection Sign-off in WAWF
Ammo distribution in the IBCT
Ammo Forecast Calculator Automated
Ammo Inventories
AMMO Price Listing
Ammo Production
Ammo, Dummy Rounds
AMMO-45
Ammunition
Ammunition dunnage
Ammunition Shipping
AMSC, RMSC and Limited Competition
An alternative to 52-227.14 Rights in Data General.
Analog to DD254 in Inter- or Intra-Agency Support Involving Funding Transfer
ANC Proposed Price Evaluation Adjustments
Ancient Excess Goverment Proeprty
Announcing Award Information for Contracts less than 25K?
Annual COR File Review
Annual leave under SCA
Annual maintenance
Annual Program Plan Template
Annual Representations and Certifications and same day of award certifications
Annual Reviews of BPAs
Another Agencies Clauses
Answer needed quickly - Releasing an RFP in Advance of Appropriation - 3400 funding
ANTECEDENT LIABILITY
Antedating performance of reimbursable work on a MIPR
Anti Defiency
Anticipated number of awards.
Anticipatory Cost Letter
Antideficiency Act
Anti-Deficiency Act
Anti-Deficiency Act
Antideficiency Act grey area clarification
Anti-Deficincey Violation
Any time constraints associated with a Pre-Solicitation notice?
AO approval-GPC
AoA Addendum to Develop Applications on Exiting SOA/SaaS IT system
AoA Format
AoA needed for fielding decision
AoA statutory requirement
AoA waivers and new 5000.02
AP and RFP release
AP Requirements for BOA
Apartment lease expenses
APB
APB - What to include?
APB and permenant sustainment modifications
APB Breach
APB Extension Determination
APB Requirement
APB rules pertaining to programs with Increments
APB Schedule Breach - ACAT III
APB Template To Show Affordability Goals/Cap as KPPs?
APB Termination
APB Updates for Post-FD DBS
APB Waiver Authority
APF Funds
APF versus Fund Raising type purchases
APML Delegation
APML, DAPML and FST Lead Roles and Responsibilities
APO
APO Information
Apparent Authority
Applicability of 252.211-7003 to GSA Supply ancillory Construction DO
Applicability of 252.228-7001 to Contractor Owned Aircraft
Applicability of Approved Accounting Systems and EVM to Small Business Concerns
Applicability of Business Systems Clauses on IDIQ Contracts
Applicability of Buy American FAR clause to USN or USCG shipbiulding contracts
Applicability of Clinger-Cohen Act and SBIR Phase II actions
Applicability of DBA on Non-US Subcontractor Labor Hours During Travel
Applicability of DFAR 252.225-7008 Specialty Metals
Applicability of DFARS 252.245-7002 to Change Order Proposals
Applicability of DoDD 5000.01
Applicability of FAR 13.5 to 2013 Clinger Cohen changes
Applicability of FAR 19 to NAF.
Applicability of FAR 52.217-8 Option to Extend Services
Applicability of FAR 52.245-1 Government Property dated April 2012 in FMS Contracting
Applicability of FAR PAR 42.708 15 Percent Waiver to Subcontracts
Applicability of FAR Part 9
Applicability of FAR/DFAR and SR/JTR regulations to subcontractors when not explicitly referenced
Applicability of Modular Contracting to National Security Systems
Applicability of Service Contract Act and Contractor Manpower Reporting
Applicability of the JTR and FTR to FRA contractor employees
Applicability of the Selection of Architects and Engineer statute to NAF procurements
Applicability of the Trade Agreement Act to GPC Procurements
Applicability of the UC APL to National Security Systems
Applicability to the Buy American Act and Leasing Vehicles
Applicabilty of Program Protect Plans-PPP for ICT
Applicable bases for overhead pool costs
Applicable clauses at IDIQ and Task Orders
Applicable Consent of Surety Form - Construction
Applicable directives for nuclear weapons logistics and management
Applicable FARs
Applicable funding for travel for system training
Applicable labor laws governing DOD contract issued in US to American firm
Applicable PSC/FSC Codes?
Applicable Wage Determination When the Job is Not on the Correct Wage Determination.
Applicablility of DFARS 215.407-5 Estimating Systems
Application and use of the Simplified Aquisition Threshold
Application for DO rating
Application of Alternate Strucutred Approach to Contract Profit on Modifications
Application of Contractor Business System Clause
Application of Costs on WGL DD1547
Application of Earned Value Management EIA-748 Guidelines on Firm Fixed Price CLIN
Application of FAR 52.216-10 Payment Withhold
Application of FAR 52.219-14 Limitations on Subcontracting
Application of Penalty to a cost reimbursable contract valued over 500K that did not include the FAR Clause 52.242-3.
Application of Personnel Cost under FAR 52.219-3
Application of PGI 245.402-71
Application of Stevenson-Wydler Technology Innovation Act
Application of the 6 percent design limitation when design is modified during construction
Application Specific Integrated Circuits (ASICs) Commerciality Determinations
Appllying Sales Tax on Construction contracts
Applying EVM in a mixed CLIN contract
Applying Fee and Indirects on Cost Type Contracts
Applying GEIA 0007
Appointment of an Administrative Contracting Officer
Appointment of Property Administrators - Appropriate Agency Authority
Apportionment Process
Appropriate Acquisition Level to write PWS for Contracts valued at $1,000,000?
Appropriate Authority FAR Clause
Appropriate Clause
Appropriate Clause citation
Appropriate Clause Flowdown
Appropriate Color of Funding for Testing
Appropriate Design Fee
Appropriate due dates for CDRLs aka DD1423s?
Appropriate funding appropriation
Appropriate funding for Sustainment of Transition Space in a MILCON Project
Appropriate POC
Appropriate use of Air Force 57X3400 funds - can they be used for basic research?
Appropriate use of expired funds for adjustments
Appropriate Use of Reimbursable Funds Received Under Economy Act
Appropriate use of the Dash 8 clause FAR 52.217-8
Appropriated Funding in a Program - What is an allowable purchase with procurement funds?
Appropriated Funds
Appropriated Funds
Appropriated funds
Appropriated Funds and Appliance purcase
Appropriated funds for safety equipment directive
Appropriated/Non-Appropriated mixed purchased property
Appropriation 3010 Usage with a Severable Service Contract
Appropriation Breach
Appropriation concern.
Appropriation for Engineering and Installation Costs
Appropriation for First Article Test and Low Rate Initial Production
APPROPRIATION LAW FOR USE OF RDTE FOR PCS COSTS
Appropriation used for Shipping Cost
Appropriations and Defense Authorization Act Title 10, U.S. Code Section 2410a
Approval for Payment and Performance Bonds for Construction
Approval of Final Invoices by Contracting Officer
Approval Process?
Approval threshholds at FAR 13.501
Approved Accounting System
Approved Accouting System on Subcontracts
Approved Army Tool or Method to develop a Maintenance Allocation Chart
Approved DID Formats
Approved Government Accounting System
Approved GWACs?
Approved Scrap Procedures
Approved Sources for Ice
Approving authority for an updated OMS/MP
Approximate timeframe to receive USD Comptroller approval for a replacement contract over 4M
Aprroval to utilize a Receipt and Issue System
APSA vs DSOR
APU Designation Letter
Aquisition Categories
Aquisition plan
Aquisition Plan Waiver
Aquisition Program Baseline APB Guidance
Aquisition Strategy Planning
Architec/Engineering IDIQ
Architect and Engineer Services commercial or non-commercial?
Architect and Engineering
Architect and Engineering Services Contract Officer Representative Training
Architect and Engineering State Law or Federal exemption
Architect-Engineer Request for Qualifications - Are clauses included at RFQ or RFP only?
Architect-Engineer RFP
Architecture and Engineering
Architecture and Engineering requirements and the Small Business Act
Architecture and Engineering Servcies
Architecture relationship to Acquisition
Archived Requirements Documents
ARCO Curves or Weight Advantage Curves
Are 5-day Notification Letters to SB Offerors for a T.O. under a MATOC required?
Are A/E contracts exempt from service contracts labor standards 52.222-41?
Are Access to Internet Sites Considered a Service or Commodity
Are acquisition strategies required on procurments using FAR 13.5 over $150,000.00
Are agencies such as DARPA subject to DoD Instruction 5000.02?
Are all legal costs unallowable?
Are Ammunition Data Cards Required on Test Articles
Are brand name requests in an RFP for FFP Construction Contract modifications prohibited?
Are Cash Bonuses allowable
Are certain Cost Type service contracts exempt from PGI 245.103-70?
Are concessions allowed when using sealed bidding procedures?
Are Construction Contracts Exempt from EEO requirements
Are contract fees included in the EVM PMB?
Are contract mods necessary for inter-service reutilization? Plant Clearance
Are contractor reps and certs required to be printed out in the contract file?
Are contractors bidding on an acquisition program permitted access to the CDD?
Are Contractors entitled to Tax Exemption when purchasing Cell phones for Government to own?
Are contractors for commercial items exempt from filing the form, VETS-4212?
Are contracts for memberships considered service contracts?
Are CORs and QASPs required for service contracts awarded under at or below the simplified acquisition threshold
Are costs associated with disaster assistance allowable?
Are counteroffers certified cost or pricing data?
Are Customer Directed Sources Exempt from FAR requirements for full and open competition?
Are DD 577s needed for CORs?
Are dealer's quotes for the same product considered competition?
Are DIDs and CDRLs required for all information requested under contracts?
Are donated funds subject to the Anti-Deficiency Act?
Are ECPs necessary to support software development prior to reaching FOC?
Are escalation cost for labor allowable in a FFP modification
Are evaluation factors required for Sole Source 8a Proposals
Are exchanges or negotiations allowed under FAR 15.101-2 LPTA selection process
Are FAR Part 15 Clauses Used when posting a Notice of Intent to Sole Source Commercial Items FAR part 12?
Are FEDEX charges subject to the Service Contract Act
Are FMS Cases subject to the Anti Deficincy Act?
Are FMS contracts exempt from COR requirements
Are forecasted changes in the currency exchange rates an allowable cost
Are Funding-Only Modifications Always Unilateral?
Are funds expired?
Are gains or losses, and associated costs, with hedging purchases allowable?
Are General and Administrative expenses allocable to Travel Cost under Federal Travel Regulations for contractors
Are Government Contractors bound by the Joint Travel Regulation?
Are GSA Industrial Funding Fees unallowable?
Are Hotel Service Charges On Meals Considered A Gratuity
Are ice dispenser/machines an allowable purchase.
Are Indian Incentive Program payments subject to interest?
Are Interagency Agreements Considered Contracts
Are items provided to a contractor for which a service must be performed on and returned considered GFP
Are Job Fairs Considered a Service
Are LDs enforceable when the contractor is already late and the Government adds in-scope work?
Are Legal Costs for Protest Unallowable?
Are major subcontractors required to have an adequate accounting system on a cost reimbursement type contract?
Are Managed Print Solutions prohibited by FAR 8.8?
Are mandatory sources required for GPC single purchase increases up to 25K?
Are Market Research Report/Commercially Determination and Competition Advocates Shopping List required for Grants?
Are Merger Acquisition Divestiture-MAD- salary expense subject to materiality criteria?
Are Micro-Purchases awarded on a written contract exempt from assignment of a COR?
Are mobile phones considered GFP
Are NAF BPAs required to have a contract ceiling amount?
Are NAICS classified as either service or supply?
Are negotiations required for a change order modification on a FFP 8A Construction Contract
Are overhead, office expenses, operational expenses, and General and Administrative expense allowable and allocable to travel?
Are parts being repaired considered property released for work in process?
Are PCOL letters constructive change to contract requirements without a contract modificatrion
Are PCOs held accountable for uploading proper digital contracts?
Are phase in periods considered in a service contract as part of the 5 year maximum of a service contract
Are PMAs required prior to MS B?
Are PMSA Corrective Action Plan Acceptance Letters Required or Recommended?
Are Price Negotiation Memos Required for CHESS Buys?
Are prices or elements of price required on a base FFP IDIQ for services?
Are Prime contractors allowed to count a small business against multimple socio-economic goals
Are Program Identifiers Required in Priority Ratings for DPAS-Rated Orders?
Are Quality Assurance Surveillance Plans required for each delivery order under a D type contract or is a QASP only required for the DType contract itself?
Are R and D contracts considered a service?
Are rental of space leases covered by the FAR?
Are Rentals a Supply or Service?
Are SB Participation Plan Goals Provided by government or offereror
Are section 1206 projects considered Foreign Military Sales?
Are services contracts under SAT still required to have a COR if they are not using Part 13?
Are services contracts under SAT still required to have a COR if they are not using Part 13?
Are Sets, Kits and Outfits considered repairable?
Are ship-in-place deliverables considered Contractor Inventory?
Are site visits prohibited prior to issuance of an RFP?
Are small business primes required to meet requirements of 52.232.99?
Are Small Business Subcontracting Plans Required for Foreign Military Sales Contracts?
Are Software Licenses and Support considered a supply or a service
Are software licensing and computer maintenance agreements and warranties part of CPSR
Are Sole Source Bridge Contracts Required to Be Posted per GPE Prior to Award?
Are State and local laws, to include state environmental law and permits, applicable to federal construction contracts on federal land to include the stopping of federal construction contracts?
Are Statement of Works required for task orders
Are T and M Contracts Subject to TINA Requirements
Are T&M Contracts also Cost-type contracts
Are task/delivery orders stand-alone contracts?
Are the 4 million dollar and 6.5 million dollar thresholds for 8 a sole source awards changed to 20 million dollars by the DoD/SBA Partnership Agreement signed in October 2012?
Are the remaining Option Periods forfeited if an option period is excerised early?
Are the requirements of FAR 37.601 required when purchasing a Subscription?
Are there any Best Practices or Guidelines available for conforming a contract?
Are there any policies or procedures on allowing a Contractor or Design Consultant to serve on a Technical board?
Are there any prohibitions against issuing an IDIQ contract using Simplified acquistion procedures?
Are there best practices for Software Sustainment?
Are there options available to the Acquisition Executive to keep a program ACAT III even if funding thresholds are exceeded?
Are there step by step requirements for terminating for cause?
Are there thresholds for admin mods?
Are threshold and objective requirements appropriate for a Systems Requirements Specification
Are TO PoP extensions limited to 20 percent of the original PoP?
Are Travel Costs to and From Place of Performance Allowable?
Are Travel or Other ODCs Permissible on Labor Hour Contracts?
Are UFCs Automatically Required?
Are utility contracts awarded using FAR 41 contracts for services (follow up to response)?
Are Utility Contracts considered commercial services?
Are Warranties a Supply or Service
Are Warranties a Supply or Service
Are we allowed to pay in advance annually for Software upgrades and updates
Are we allowed to use the GCPC to pay for Pest Control Service?
Are you required to post the solicitation for SAP Justifications?
Area Beautification
Area Rug to cover bare concrete section of office
Area set aside
Armed Forces Procurement History
Arms, Ammunition and Explosives, Sensitive, Confidential, Classified and COMSEC
Army Acquisition Category: ACAT IV?
Army ammunition shared with airforce/marines
Army Ammunition Training
Army CHESS TAA Compliance
Army contractor release of liability for service contracts
Army Cost position and the Independent Cost Estimate.
Army equivalent of an AF616?
Army GPC and FSS, BPAs, and IDIQs
Army Inflation Indices for FY19 POM/BES Build
Army major end item from DD-61 thru Zlin to FEDLOG
ARMY NAF GPC CARD TO BUY USED BOOKS ON AMAZON
Army O and M 1 Year Funding
Army Proprety Accountability and Responsibilities
Army R & D subject to Army Request for Service Contract Approval form?
Army Regulation
Army Regulation
Army Regulation for Weekly Inspections of Contractor
ARMY REGULATION THAT REQUIRES 49 cfr
Army Regulations versus Contract
Army Software and Hardware Approved Products
ARMY SOUM FOR USE OF BLANK AMMO, THEN SWITCHING TO LIVE FIRE
Army SSA vs Use of Base Supply Center
Army use of DoD contract vehicle
Army vs Navy concept, definition and differnces calculating Ao
Army Working Capital Fund (AWCF) for Fielded System in Production
AROC Briefing Charts
AROC vs. AROCM
ARRT data transfer
ARRT QASP Perfromance Rating and Criteria Table
ARRT Training Videos
AS for a MAC
As is property debate.
As Required Services Contract
AS9100
AS9100, Section 8.3 Control of Nonconforming Product
ASARC Requirements WIPT
Asbestos
Asbestos Abatement
Asbestos Abatement - Service NAICS code vs. Davis-Bacon
ASIOE
ASIOE for system increased by AAO
As-Is GFP
Ask A Professor for Grants?
Asking for Both Technical and Cost Proposal in AE Solicitation
ASP Briefing for SCATs
ASP Changes/ADM
ASPR
Assessing LDs after contract extension
Assessing liability for Contractors using tools
Assessing Liquidated Damages
Assessment and Authorization under DIARMF
Assessment and Repair
Assets Purchased by State Grant
Assigment of Task Orders
Assignment of Administration of GSA Orders to DCMA
Assignment of Claims
Assignment of Claims
Assignment of Claims
ASSIGNMENT OF CLAIMS ACT
Assignment of Claims Modification
Assignment of Claims on a Commerical Contract with Commerical Item Financing Authorized
Assignment of DCMA Administration Offices
Assignment of Part Numbers in the Marine LAV SL-4-08594C
Assignment of Program Managers to Service Acquisitions
Assist with a process
Associate Contractor Agreement
Assumption of authenticity for digital signatures
Assurance of performance?
Asterisks in government contracts
At What Point is a MOPAS completed?
At what point is government not obligated to pay on an aged invoice?
At what rate is a contractor required to issue a credit for deleted work?
A-Task Order - IDIQ Contract
ATL Guide
Attaching an Offerors Proposal to the Contract Award
Attachments and Exhibits
ATTN: Dr. Douglas Goetz Auditing without representation
Attribute vs Variable
Audit and approval of indirect rates for cost type contracts.
Audit Focus
Audit letters to contractors
Audit Readiness and Contracting
Audit Requirements for Certified Cost and Pricing Data Changes
Auditing Contractors Under Time and Materials Contracts/Approved Accounting System
Auditing Frequency
Auditing on Indirect costs for CPFF contracts
Auditing Utilization Government Owned Material
AUDITS
authoritative data source for all requirement documen
Authoritative References for CIO Positions
Authoritative Source
Authoritative Source for Guiding Sign off of Acquisition Strategies
Authorities of the Milestone Decision Authority
Authority
Authority
Authority
Authority for continuing franchise agreement with local city
Authority for de-obligating funds
Authority of contracting officer vs. functional chief -supervisor-
Authority of Instructions, Tech Manuals, Guides, and Handbooks referenced in contracts
Authority of Small Business Procurement Center Representative
Authority of Sole Source Acquisiton under FAR Subpart 13.501
Authority to advertise
Authority to Deviate from a FAR Clause
Authority to Exercise an Option after the Base Period Expires on a BPA
Authority to Exercise an Option Task
Authority to Modify Contract
Authorization to Proceed - ATP
Authorization to use FEDBID.
Authorized government representative
Authorized GPC Payment/Purchase
Authorized Reimbursements from TDY travel
Authorized representative as referenced in FAR 52
Authorized time extensions for weather related delays
Auto Allowance
Automated Contracts document tool
Automated Testing - Definition and/or Best Known Practices
Automated tool for building logistics PWS - Army
Automatic Releasable Information
Availability and Maintainability
Availability of Funds
Availability of Funds-- Can it be used as incremental funding authority?
Availability or Metrics vs Spot Rate
Availability Rates
Available Inspection Data
Average cost of TADSS and or SW development
Award fee
Award Fee Chairperson a voting member?
Award fee dispute
Award Fee Evaluation Board AFEB Members- members that must be present at board
Award Fee Performance Period
Award Fee Periods
Award Fee Replacing a QASP
Award Fees Paid used to determine final cost
Award Few Briefing and Nomination Letters
Award Multiple Contract vehicles based on one Soliciation and individual CLINS
Award of a P Order After Soliciting Offers using a RFP?
Award of Option periods to select Multiple Award Contract holders.
Award of single contract over 100M
Award of the contract
Award signature
Award Term
Award to 8a
Award Value on an IDIQ Contract
Award without and with discussions in multiple award competition
Award without qualified COR
Award/Incentive Fee Study Report
Award>SAT
Awarded a GC/AE/CM contract in 2009, Can we still use these contractors?
Awarded Contracts
Awarding a contract for a warrantee with options
Awarding a GSA Order against and Open Market RFQ
Awarding a Labor Hour contract for commercial services to an 8a contractor
Awarding a Reduced Period of Performance from the Solicitation
Awarding a requirement for services
Awarding a Sole Source Contract before Closing Date
Awarding a task order for longer then 12 months with procurement dollars
Awarding Construction over 400K on SF 1449
Awarding directly to city municipalities??
Awarding ELINS
Awarding IDIQ Follow-on Prior to Expiration of Current Requirements Contract
Awarding Multiple Single Award Task Order Contracts awarded off of the same Statement of Work/Performance Work Statement
Awarding Only One CLIN f/base year, IDIQ or C
Awarding Segments when No Proposals are Received in Response to an RFP
Awarding the contract minimum under an IDIQ
Awarding to a Small Business when solicitation states Open Market / Unrestricted
Awarding TO or DO in Current Year with an Effective Date of the New Fiscal Year
Awarding to the Next Lowest Bidder
Awarding to the next lowest bidder after termination of the first - IFB
Award-Related Purchase Using the Government Purchase Card
Awards, plaques and coins
AWDIT Description
B61 CDD
BA16/BA17 60MM mortar rounds
BAA
BAA and RDT and E Budget Activities
BAA applicability to FMS
BAA debriefs
BAA Flexibility
BAA or BPA ? Which is best for what ?
BAA vs RFP
BAA White Paper
BAAs – Pre-Proposal Communications with Vendors
BAC for total contract variance
BACKGROUND INVESTIGATION
Backup for proposed ODCs if amounts are provided in solicitation
Bailment Agreements
Bailment of military aircraft
Bait and Switch? A-E and subcontracting plans
Balance of Payment Program and DFARS 252.225-7045
Balancing COR Contract Assignments
Bandwidth requirment
Bank Service Charges
Banking of Funds
Bankruptcy Contract Closeout
Bankrupting a contractor
Bartering
Barters and/or exchanges
Base and Option year funding capacity
Base and Optional Service Periods
BASE AND OPTIONS
Base extension and funding of 1st option
Base Extension if Options Exist, Funding Still Available and is Funding Still Good?
Base Operation Support Services Contract
Base Year and Option Year
Base year POP and option year overlap
Basic construction contract has gone beyond the contract completion date
Basic contract for less than 12 months with option period of 12 months in same FY
Basic Ordering Agreement
Basic Ordering Agreement, Order Expiration
Basic Ordering Agreements BOA
Basic Ordring Agreement
Basic Requirements Flow Down On ID/IQ Contracts
Basis for award on a Maintenance BPA
Basis for Sole Source
Basis of Issue Plan (BOIP) Development
Basket SPO
Battle Spares and Forward Based Spares
BBP Information
BBP 3.0
BBP Specific Actions
BBQ Gril
BCA vs CBA
BCF 221 Appeals Process
BCL Process Draft Chart
Becoming a PoR
Below Threshold Reprogramming BTR of Expired Funds for in scope obligation
Below Threshold Reprogramming while under Continuing Resolution
Beneficial Occupancy and the Warranty start date
Benefits of an adequate Property Management System
Benefits of Competition
Benefits on requesting re-certification on an existing contract vehicle
BER Units
Berry Amendment
Berry Amendment for R and D footwear
Besides DADMS, what other repositories the Department of Navy uses
Best Buy and Reward Zone program
Best Contracting Vehicle to support uncertain funds.
Best Contractual Vehicle for CASREPs
Best Estimated Quantity Table for RFP
Best Interest Determination Requirements
Best Option For Services Contracts MATOC or SATOC
Best Practice for administering FFP Purchase orders that have remaining funding
Best practice for tailoring SE Life Cycle for software acquisition
Best Practices
Best practices for CCMD managing service requirements for joint function
Best Practices in T and E Final Report
Best Practices of using FPIF contract type for sustainment activities
Best practices or guidance on when a CDRL should be submitted for approval
Best Practices Roles Responsibilities
Best practices to transition from Rapid Acquisition Program to Program of Record
Best Procurement Approach
Best type contract for procuring environmental clean up services.
Best Value
Best value based on price and delivery
Best Value Determination
Best value determination for a QEB.
Best Value for Supply buy
Best value trade off
Best Value Trade-off
Best Value vs Low Price Technally Acceptable on Construction
Best value worksheet
Best Value//Preferred cost estimating method
Best Values
Better Answer?
Better Buying Power
Better buying power
Better Buying Power
BETTER BUYING POWER LESSONS LEARNED
Better Buying Power requirement for 1-bid proposal under MAC IDIQ
Betterments
Beyond Economical Repair
Bid Abstract Releaseable?
Bid and Preparation Allowability
Bid and Proposal Costs
Bid Bond alternate forms
Bid Bonds requirements
Bid Guarantee Waivers
Bid Opening
Bid Opening
Bid Opening Officer?
Bid Results
Bid Results / Disposition / Debriefing of a Grounds Maintenance Contract
Bid Samples
Bidders List
Bidding on Govnerment Contracts
Bids Exceed Design within Funding Limitation
Bi-Lateral Change or Partial T4C
Bilateral modification of a delivery order after contract POP
Bilateral modifications after CCD has passed
Bilateral Purchase Orders
Bill of Materials or BOM
Billing for CPFF type contract
Billing Frequency
Billing monthly/quarterly
Billing of Contract Close out cost
Billing Rate Adjustment for Cost Reimbursable Contracts
Binding an IDIQ contract
bksl5402026178
Blanket LOA?
Blanket Purchase Agreement
Blanket Purchase Agreement - Option Periods and Ordering Periods
Blanket Purchase Agreement - Small Business Coordination
Blanket Purchase Agreement (BPA)
Blanket purchase agreement competition over 25k
Blanket Purchase Agreement for Services
Blanket Purchase Agreements and Wage Determinations
Blanket Purchase Master Agreements
BLanket Purchasing Agreement
Blasting cap container
Block 18b on SF 1449
Block Change Amending Government Property GP Clauses All Inclusive or Ambiguous
Block or Program Upgrade and Requirements/Capabilities Documentation
BLOCKING AND BRACING
Blocks 28 and 29 on SF 1449
Bnefits of purchasing source code from OEM
BO/A/OPC and quotes
BOA - Soliciation Requirements when there is more than one BOA for a particular product
BOA and Compition
BOA Ceiling
BOA Clause Update and Class Deviations
BOA Management??
BOA Open Delivery Orders
BOA or Extension
BOA order solicitation period
BOA Synopsis
BOA vice IDIQ
BOAs and CLINs
BOAs and IDIQs for NSA Procurement
BOI
BOIP narrative
BOIP Update
Bona fide need
Bona Fide Need
Bona Fide Need
Bona Fide Need
Bona Fide Need
Bona Fide Need
Bona fide need
Bona fide need
Bona fide need
Bona Fide Need - R&D
Bona Fide need and delivery schedule
Bona Fide Need at End of Year
Bona Fide Need Determination
Bona Fide Need for RDTE Appropriation
Bona Fide Need Memo
Bona Fide Need Non Severable
Bona Fide Need Rule
Bona Fide Need Rule
Bona Fide Need Within a Fiscal Year
Bona Fide Need, Full Funding Policy, and A New Start Program
Bona Fide Need-Government Service
Bona Fide Needs
Bona Fide Needs - Commercially Available items
Bona Fide Needs Rule
Bona fide Needs Rule
Bona Fide Needs Rule as it applies to work dekays caused by ship availability dates
Bona Fide Needs Rule in relation to a Request for Equitable Adjustment
Bona-Fide Need and Concurrency
Bona-fide-need
Bond Requirements for Modifications
Bonding
Bonding on Requirements Contract
Bonds
Bonds
Bonds
Bonds for Demolition?
Bonds requirements Svs Contract w/Construction Work Elements
Bonifide Need Rule
Bonuses
Bonuses as ODCs
Borrow payback between government agencies
BOS Definition
Bottled water
Bottled Water
Bottled Water
Bottled Water with Approved Meal
Bottom Line Number for Negotoations
BP 1600 funds
BP costs
BPA
BPA
BPA and bulk funding
BPA and CMR association
BPA Annual Review Approved Price List
BPA Applicability to CAS Threshold
BPA Award Five Years
BPA Call Awards after Graduating from SBA 8a status
BPA Call Order Threshold
BPA Call Order Threshold and FAR 13.5 Applicability
BPA Ceiling at Individual BPA level
BPA Clauses - What do you really need?
BPA competition
BPA Contract Increase Contract Ceiling
BPA Disposition
BPA Equitably distribute calls amoung suppliers.
BPA Establishment/Warrant Authority
BPA for non-commercial items
BPA for Propane and other gases where prices fluctuate
BPA IT Technical Services Support.
BPA Master Limitation per fiscal year
BPA or IDIQ
BPA Orders
BPA PoP
BPA PoPs vs. Task Order PoPs
BPA Postings and Competition for GPC Thresholds
BPA required documents
BPA services
BPA Solicitation
BPA Splitting Requirement
BPA under FAR 13.303
BPA vs BOA
BPA VS BOA
BPA with multiple GPC Cardholders
BPA/RAD
BPAC Realignment
BPAs
BPAs with Option Years
BPT Thresholds
Branch Chief Contracts
Brand Name Competition
Brand Name for Books/Publications
Brand Name J/A for Task Orders from CHESS contracts
Brand Name Justifcation and Approval
Brand Name Justification
Brand Name Justification
Brand Name Justification for a sole Source Award Under the 8a Program
Brand Name Justification.and Small biz set-asides
Brand Name Only - Evaluate Non-Brand Items?
Brand name or equal - no class waiver
Brand Name or Equal Solicitation for Customized Commercial Product
Brand name or Equal Technical Evaluation Requirement?
Brand Name or Sole Source subcontracting requirements
Brand Name Specification when invoking the Changes Clause
Brand Name under $3,000
Brand name under 5K
Breach of Acquisition Program Baseline
Break in Procurement Integrity?
Breakdown of Sustainment Activities
Breaking a Tie
Bridge Buy, Life-Time Buy, End of Life Buy
Bridge Contract
Bridge Contract
Bridge contract
Bridge Contracts
Brigde Contracting Funding
Broad Agency Annoucements
Broad Agency Announcement
Broad Agency Announcements
Broad Agency Announcements
Broad Agency Announcements and Competition/Market Survey
Brooks Act Hours by Employee Evaluation
BSAS or Level III CAR or both?
BTR decrease of a marked PE
BTRs to restore funding marked by congressional committees
Budget
Budget Activity 6 Personnel Costs
Budget Exhibit R-3
Budget for Weapons System
Budget-Free Meals in the deployed AOR
Budgeting guidelines for certain contract types
Build to Print vs build to spec
Build to print WRT export control
Builder's Risk and Subcontractor Default Insurance
Builder's Risk and Subcontractor Default Insurance
Building an FMS Letter of Offer and Acceptance, LOA
Building lease
Bundling
Bundling and FMS
Bundling- Is it 1 or 2 small businesses?
Bundling or Consolidating and documentation
Burden Rate Increase on an Active Contract
Burn Rate
Bus Contract Commercial Service Minimum and Maximum Fuel Charges
BUS test
Business
Business bought by another
Business Case Analysis
Business Case Analysis vs. Cost-Benefit Analysis
Business Case and documenting KPPs
Business class travel
Business Enterprise IT Systems
Business Owner and working on a contract as an employee
Business/Contract Clearance for SABER Task Orders
Buy America Act
Buy American
Buy American Act
Buy American Act
Buy American Act
Buy American Act
Buy American Act
Buy American Act - Construction Contract - COTS Made in China
Buy American Act - Construction Contracts - Canadian Steel
Buy American Act - Construction Contracts - emergency life safety systems
Buy American Act - Construction Contracts - micro purchase threshold
Buy American Act - Construction Contracts - micro purchase threshold COTS
Buy American Act - World Trade Organizations
Buy American Act and Trade Agreements
Buy American Act Applicability
Buy American Act Application
Buy American Act Compliant- Manufacturer Pentair Erico Caddy Fan Fixture Mount - 512HDFM35 Heavy Duty Fan/Fixture Support 35 -50 lbs.
Buy American Act for Remanufactured/Refurbished Products
Buy American Act Waivers
Buy American Act-Construction Materials-Post Award Determination
Buy American for Commercial Item
Buy American requirement
Buy modification kits early
Buyer
Buying a Trophy with GPC
Buying ahead of need vs. initial outfitting
Buying an item not LPTA and not on Procurement List, from Ability One
Buying before need
Buying books with GPC
Buying down a severable service contract.
Buying extending warranties
Buying foreign metal to be milled for commercial purchase
Buying IT Integrated Software Service System
Buying Metal from Canada
Buying Metal from Canada
Buying stamps
Buying ticket for Commercial use
Buying Used Equipment
Buying used spare parts
Buying versus repairing
C Contract functioning as a JOC or IDIQ?
C vs. P Type Contracts
Cable services
Cable TV
Cable TV and Franchise agreements
Cable/Internet Services
CAE vs. SPE Role Distinction
CAGE and TINs
CAGE Code
Cage code address change
Cage Code Linking
CAGE CODE REQUIREMENT FOR SUBCONTRACTORS
CAGE CODE Types
CAGE requirements
Calculate a learning curve and quantity curve equation
Calculating Advance Procurement
Calculating Historical cost of 1 Percent
Calculating Impact of Production Gaps
Calculating interest rate
Calculating OH, Profit and Direct Labor Rates
Calculating PBPs
Calculating Royalties as a Percentage of Net Sales Price
Calculating unsettled costs
Call Code
Call order extension if BPA is expired
Call order extension if BPA is expired-follow up question to ID 119032
Call orders against BPAs
CALT vs PALT vs TALT Definitions
CAM requirement validation
Can 3400 and 3080 funds be used in a Working Capital Fund and who authorizes their color change?
Can 52.216-21 be added by modification
Can 52.222-24 & 52.222-29 be included in solicitations for commercial items?
Can 6.4 and 6.7 Funds be used in an OTA?
Can 6.5 RDTE funds be spent on activities like risk reduction and/or in-house costs prior to Milestone B approval?
Can a 100 percent Set Aside for Small Business Contractor Contract Out Work
Can a 2210 IT Program Manager be in an non-acquisition role?
Can a 5 year IDIQ Construction Contract that does not contain option years be extended to avoid service interruption?
Can a 5 year multi-year contract be extended past 5 years?
Can a base period exceed 365 days?
Can a BPA be awarded for the same services on a current MOA?
Can a BPA be established for a one-time event?
Can a Caucasion Female be considered for 8a status due to sexual orientation?
Can a CCB be for both OM and RDTE activities
Can a CDD/CPD be replaced with an ONS
Can a CDRL be deleted from a contract SOW, Exhibit A once a delivery has been made for that CDRL
CAN A CLOSED CONTRACT BE RE-OPENED
Can a CO request SF1413 be submitted for all subcontractors under a commercial service contract?
Can a Commander authorize work to begin based on the position of commander?
Can a Company Charge G and A on Taxes?
Can a construction contractor perform after expiration date in forbearance on a FFP IDIQ task order?
Can a contract be modified during a 52.217-8 Extension?
Can a contract be written for an administrative assistant?
Can a contract exceed 5 years including options?
Can a Contract for Fire Protection and Emergency Services with the Local Municipality be commercial?
Can a contract incorporate 52.217-8 alone?
Can a contract option be awarded after the exercise date?
Can a contract period of performance start on a weekend?
Can a contract POP be extended by modifying a CLIN POP date, or issuing a delivery order prior to POP end?
Can a Contract Specialist issue the preliminary notice of intent to exercise an option to the contractor?
Can a contract with period of performance expired, be reinstated?
Can a Contracting Officer also be the acceptor for his own contract/order?
Can a Contracting Officer be forced to sign a contract?
Can a contracting Officer transfer their authority to another agency?
Can a contractor be held to prices provide under a BPA option year?
Can a Contractor Charge general and administrative expenses on a Contract that uses a GSA Schedule as the contract vehicle?
Can a contractor charge profit on labor burden?
Can a contractor charge seperate contracts
Can a contractor continue work under a CPFF CLIN at no cost to the government?
Can a Contractor dictate access to a government system?
Can a contractor drive a Government Vehicle that is NOT provided as GFP?
Can a contractor enter into a collective bargaining agreement (CBA) after a Contract was awarded using a Wage Determination?
Can a contractor ever be paid before work is definitized?
Can a Contractor Float a Holiday
Can a contractor give credit from expired/closed contracts to be used on future contracts?
Can a Contractor give his employees a BBQ on Government time? This is a FFP contract and has a Labor CLIN
Can a Contractor perform Marketing for the Government?
Can a contractor PM or management ask KO to remove the COR
Can a Contractor proceed on a differing site condition on a Design - Build Contractc
Can a Contractor propose three different profit fees on CPFF - one for main work, one for ODCs and one for travel?
Can a Contractor receive G&A Expense applied to Material and/or Travel Expense on a T&M Contract
Can a Contractor request consideration or adjustment on a FFP contract
CAN A CONTRACTOR REQUEST TO OPT OUT OF AN IDIQ CONTRACT?
Can a contractor submit incremental bills for items purchased under a contract
Can a contractor take the COR training?
Can a contractor transfer government property on behalf of the army?
Can a contractor use both a daily rate and a percentage rate depending on the contract?
Can a contractor withdraw their proposal under an IDIQ Task Order Proposal Request after the Notice of Award has been issued?
Can a contractor work onsite in a government facility after core hours
Can a contractor write its own scope of work?
Can a COR perform the same duties as a Program Manager?
Can a COR/COTR issue a Notice to Proceed
Can a CPFF effort go beyond the contract PoP?
Can a DCAA Audit be Waived?
Can a dealer/distributor perform a Contractor First Article Test?
Can a defense contractor lease out office space to a commercial entity?
Can a Deputy Chairperson be appointed to a Source Selection Evaluation Team?
Can a direct award be made to SDVOSB via GSA VETS SDVOSB?
Can a draft RFP be skipped?
Can a FFP award fee contract add a 6 month extension with a mod?
Can A Foreign Developed Item Be Sold FMS
Can a Foreign National or local National be a Primary Hand Reciept Holders?
Can a government contract call out a ship to address that is direct to another Contractor facility?
Can a government employed contractor sign AF 3000 Submittals, AF 3064 Progress Schedules, and AF 3065 Progress Reports?
Can a Government Point of Contact Approve Invoices?
Can a government purchase card holder also be an equipment account custodian?
Can a GPC be used to pay a monthly lease?
Can a GPC be used to rent a boat which will be used in an operation/training?
Can a grant subrecipient charge a fee?
Can a GSA BPA be modified to add an additional item?
Can A GSA quote be considered
Can a large business perform services as a subcontractor on a 100 percent small business set aside?
Can a Manager not a COR meet with a SubContract without a COR present?
CAN A MEMORANDUM OF AGREEMENT BE CONSIDERED AS CONCESSIONAIRE CONTRACT AS WELL?
Can a minor work under an Army service contract?
CAN A MOD BE ISSUED INCREASING AMOUNTS FOR ONLY 1 OPTION
Can a MOD to CLOSEOUT a CONTRACT be UNDONE/CANCELLED?
Can a Multi-Award IDIQ Task Order have options for future work in event of emergency?
Can a Navy activity without an in-house contracting shop accept a NAVCOMP 2276A RX document?
Can a nonseverable contract crossing FYs use incremental OM N funding
Can a prime construction contractor bill for work completed by subcontractors and not pay the subcontractor within 7 days of receipt of payment?
Can a Prime Contractor apply Indirect Costs and profit on fully burdened w/profit subcontractor rates - Profit on Profit?
Can a product be exchanged on a contract?
CAN A PROJECT BE FUNDED BY MORE THAN ONE COMMAND
Can a PSC issue a contract in the name of the agency that binds the agency?
Can a Ratified Unauthorized Commitment Be Paid with the GPC
Can a Reduction in Funding Cause a Significant or Critical Change to a MAIS?
Can a required supply be both MIL-STD and Commercial?
Can a requirement be split to enhance competition
Can a requirements solicition, servicing various sites, be used to award smaller contracts, by site, to different contracts servicing that particular site?
Can a Requirements type contract be issued using FAR Part 13 SAP?
Can a Resource Advisor also be a Decentralized GPC cardholder?
Can a RFQ be utilized when purchasing under the guise of Subpart 13.5
Can a separate purrchase order be made without competition due to different source of funds?
Can a Service Contract Be Performed Outside The United States If Being Performed In The United States
Can a services contractor charge for overhead on subs costs if we are paying for contract management on a separate line item?
Can a small business be awarded a contract under a NAICS that they are not considered to be?
Can a small business joint venture rely on the approved accounting system of one of the joint venturers or must the JV itself have its own accounting system?
Can a sole-source contractor propose on part of the requirment in the RFP?
Can a solicitation be extended after it closes?
Can a solicitation Issued against an agency BPA be more More restrictive than the base Agreement
Can a squadron use a GPC card to pay for contractor travel?
Can a state agency CONTRACT with the federal Government
Can a sub contractor to an Architecture and Engineering firm be excluded from bidding on the project when it is released for construction bidding?
Can a Subcontractor submit a Request For Equitable Adjustment?
Can a synopsis be issued before the Acquisition Plan has been signed?
Can a Task Order against an IDIQ CHESS contract have option years?
Can a time extension mod be issued after 12 month POP?
Can a TO that is to fullfill the guaranteed minimum be incrementally funded?
Can a TRA for an Army program be conducted by the Air Force?
Can a UAC become and ADA Violation
Can a unit pay for a team building event with the GPC?
Can a vendor include G and A fees on invoices for Travel/ODC on a cost-type line item?
Can a vendor request a debriefing for a Cooperative Agreement Notice?
Can a volunteer cause an unauthorized commitment?
Can A-E be considered a commercial item for the purposes of the audit process?
Can agency continue construction work on task order when contract is cancelled under FAR 52.203-8?
Can an 8-a mentor/protege Joint Venture include another small business on its Small Business CTA ?
Can an Abbreviated Acquisition Program be included in a POM cycle?
Can an ACO negotiate rates in the absence of an FPRA?
Can an Air Logistics Center subcontract quote be considered adequeate price competition?
Can an AIS go to IOC with an IATO?
CAN AN AWARD BE MADE FOR LESS THAN THE SOLICITED AMOUNT
Can an award be made to small business if the RFQ is unrestricted?
Can an Brand Name Acquisition be set aside for small business?
Can an ECP be used to pursue Insensitive Munitions or IM compliance?
Can an employee of a contractor working in Afghanistan use the commissary in Ital?
Can an energy-saving performance contract (ESPC) contractor use an overseas design firm?
Can an IDIQ be issued for the same/similar services covered by an Agreement?
Can an IDIQ or multiple award IDIQ be used for unsolicited proposals?
Can an Inactive ACAT 1 program become Active again?
Can an Incurred Cost Submission (ICS) that has been closed be open again due to mutual error?
Can an inspector/acceptor pick up supplies directly from a vendor?
Can an Interagency Agreement exceed 5 years in length?
Can an IPA be a COTR?
Can an offeror not technically acceptable be rated or ranked?
Can an option be exercised early
Can an option be exercised to a third party?
Can an Option to Extend the Term of the Contract be Exercised After the Current Period of Performance Has Expired?
Can an option year quoted at zero dollars be accepted by the Government?
Can an OTA award follow a previously FAR based award for the same product?
Can an SF 1449 (Purchase Order) be used for purchases above the SAT?
Can Army Contractor be issued Keys to a Goverment Building
Can Army Research grant funds pay for civilian salaries
Can AS9100 certification be funded by the Govt?
Can assets be shipped to a contractor with a contract letter?
Can Bill of Material reflect assigned market value?
Can both manufacturer and seller prepare Certificate of Conformance?
Can BPAs be used for long-term FTE requirements?
Can Broad Agency Announcement excced Five Years
Can clins on a delivery order be different than the clins on the IDC?
Can commercial and non-commercial items be combined on a BOA order?
Can Commercial item be made to provide cost and pricing data
Can Commercial item be paid for with RDTE?
Can contractor employees be removed from the site?
Can contractor personnel be appointed as a Key Control Custodian?
Can Contractor Replace Lost Government Furnished Property
Can Contractor step-up a portion of its assets
Can contractor work beyond POP of Fixed Price task order
Can Contractors be provided the DoD Yellow Book
Can contractors capitalize interest expense on legal borrowings to acquire or construct assets?
Can contractors charge higher Area Wage Determination wages when contractor employees are TDY?
Can contractors perform end of day security checks in a government facility
Can contractors still follow DOD Manual 4161.2m
Can contractors submit invoices for snacks and meals when they are being provided DFAC privileges?
Can Contractors Supervise Military Members
Can Contractors use rental cars as GFP
Can contracts be held open for warranty items?
Can CORs be appointed as PAs and PLCOs?
Can COs now delegate voucher review and approval?
Can Cost-Reimbursement Contracts Have a Ceiling Price?
Can COTS be centrally managed?
Can DCAA dictate what can be released to the contractor by DCMA?
Can Delivery Orders be issued against a Blanket Purchase Agreement?
Can Delivery Orders Be Placed Against A Task Order Contract?
Can delivery orders/task orders be issued on awarded contracts prior to the effective performance period?
Can delivery/task orders be evaluated as separate contracts for purposes of establishing whether or not EVM is required?
Can elements of scope, requirements, be placed in section E Inspetion and acceptance?
Can ESOP contribution be considered change of ownership
Can Evaluation Criteria Be Changed Mid-Source Selection?
CAN EXCESS CAP BE PURCHASED BY ANOTHER COMPANY
Can excess funds from service center charges be used to procure items pushed into the contractors next CY?
Can existing contracts for the same service and vendor be combined into one contract?
Can Experience be an evaluation factor in a two step bid.
Can expired OMA already on a contract, be used to pay termination costs?
Can expiring funds be used to forward fund a contract?
Can FAR 52.236-22 be added to a construction contract or task order?
Can FAR Clause 52.237-1 Site Visit be mandatory in a solicitation? Can I eliminate offerors who DID NOT attend the site visit?
Can FMS ADMIN funds be used to pay for contractor training costs?
Can FMS BOAs exceed 5 years if an option is negotiated?
Can Foreign Companies Participate In Small Business Set Aside Solicitations?
Can Functional Area Evaluators monitor, evaluate and report contract performance
Can funding move from an ODC SLIN to Labor or Fee SLIN if the ACRN is the same?
Can FY 12 O&M funded Project Order period of performance end on Nov 2013?
Can G & A be applied to equiment rental?
Can G&A be calculated as a portion of self performance
Can GFP issued to one Contractor be loaned or issued to another contractor
Can government equipment be used by contractors without transferring accountability to them?
Can Government Purchase Card be used to procure advertising space?
Can GPC be used to pay deposit?
Can GPC be used to pay for dry cleaning of unit owned table cloths?
Can GPC be used to pay overdue invoices?
Can GPC be used to purchase shadow box for retirement
Can GPC OMA funding be used to purchase safety shoes
Can I accept an alternative qty quote from a vendor without resoliciting all of the interested vendors?
Can I address price, surveying the market and other factors in the option year D&F?
Can I as a government contract purchase parts for inventory as common parts?
Can I award a Task Order and then modify it when services are needed?
Can I bill up to 100 percent Fee if remaining amount is about to cancel?
Can I buy the TV with my GPC card?
Can I change contract type after FPR without reopening discussion
Can I choose to use only certain color ratings out of the DOD Source Selection Guide?
Can I consider two quotes determined to be technically unacceptable as competition?
Can I contract out 1102 functions?
Can I do a labor hours MOD on a fixed price contract
Can I have a no-dollar FFP CLIN?
Can I have multiple ACRNs under a single SUBCLIN?
Can I hold the construction contractor liable for additional A/E inspection trip costs?
Can I include an option in Task Order contract that covers 10 years?
Can I include the Option to Extend Services clause?
Can I incrementally fund NON-severable services using no-year money?
Can I leverage off another contract to fund a vendor that aligns the scope of work?
Can I make block 12 of SF 1449 Net 7 for commercial items?
Can I mix non-severable with severable services on a 5-year contract?
Can I modtify a contract to add options
Can I purchase fitness equipment with appropriated funds?
Can I purchase from GSA
Can I receive contractor credit towards my new handheld radio by giving them my displaced handheld radio?
Can I recoup previous year funding if I T4C a contract due to non-performance?
Can I share the awardee proposal with their competitor?
Can I sole-source a construction buy -under the SAT- to a SDVOSB contractor?
Can I use a GPC as a method of payment on a BPA
Can I use a waiver to procure Class II items outside supply system
Can I use appropriated funds to purchase items such as: sunblock/mosquito repellant?
Can I use appropriated funds to purchase Kitchen Appliances for office locations in romote areas where multiple employees are authorized the use of a kitchen facility or common area?
Can I use cost reimbursement on a FFP contract?
Can I use current year appropriations 3400, 3080, 3600 to fund a new contract option crossing from FY12 to FY13 even if Ive already used some FY12 funds on smaller options in FY12?
Can I use GPC to rent a tent for Ceremony
Can I use my GPA to purchase cookware?
Can I use NDAA Section 333 Appropriations?
Can I use O and M funding to perform a detailed System Security Plan
Can I write a commercial delivery order against a non-commercial IDIQ and set it up like its own IDIQ?
Can Improper Communications eliminate a potential contractor from a solicitation?
Can in scope changes be made when a task order has been extended under the Option to Extend Services clause at FAR 52-217-08?
Can Incremental Funding be used?
Can information obtain from an RFI be denied under a FOIA exemption?
Can in-scope work be added to an active task order under an IDIQ that has expired?
Can IT support contract renewals period of performance be backdated to cover lapsed coverage?
Can LCMC provide Blanket Orders as a way to deliver parts to FMS customers
Can LDs be assessed for a suspension?
Can multiple class J & As be used under the same contract vehicle
Can Multi-year Software Maintenance agreements be bought upfront
Can my contract be considered Non-Severable and paid in full for the whole year?
Can my GPC be used for Confrerence Room
Can NAICS code 237110 be used for a service contract?
Can Non-commercial Clauses Be Incorporated In a Commercial Task Order
Can nonconforming components be marked with an identification number?
Can NRE be amortized or spread across CLINs?
Can NRE costs be recouped across several contracts?
Can OCO funding be used to procure long lead items?
Can OMA funds be used to pay for RFP development of a major MILCON project?
Can OMA Reimbursables carryover like Capital Investment Program funding does?
Can one CO sign FOR another CO on a contract
Can one Determination and Findings for nonavailability exception to the Buy American statute cover multiple construction materials?
Can one quote received be considered one-source on FSS or is a LSJ required?
Can one use RDTE when no OM or Procurement funding is available?
Can OPA money can be used on a cost reimbursable contract?
Can or should AbilityOne Items be Considered Special Order Items
Can other than RDT&E funding be utilized on an existing BAA contract
Can Over and Above work be included on a Commercial maintenance contract?
Can overseas contingency operations OCO funding buy down quanties due to urgent need?
Can past performance be used as a sub factor to a proposal technical evaluation or seperated as a stand alone evaluation factor in lowest priced technically acceptable source selection procedures?
Can past performance be used as a sub-factor in evaluation a proposals technical acceptability
Can PCO Letter cite prescribed FAR clause to contractor as contract authority instead of the contract FAR clause.
Can Post Production Software Support funding be used for software upgrades on systems being funded with procurement dollars for a modification
Can procurement funding be used to fund the conduct of OT-and-E?
Can procurement items be purchased before Milestone C?
Can RDTE Funds be extended longer than 12 - 18 months
Can regulated services still be considered commercial services?
Can Retainage be use to cover liquidated damages.
Can service contractors be requested to perform janitoral services?
Can set of items be placed through the Defense Acquisition System?
Can severable services of recurring and continuous nature be awarded SFA?
Can SF 30s used to make several ammendments to a solicitation be used as second pages behind a SF 1449 for contract award?
Can Snow Removal be a Direct Contract Charge?
Can subs bill for 2088 hous annually per employee?
Can the AFWAY portal be considered a Government Point of Entry for NC2 requirements?
Can the Army join a current Navy program
Can the changes clause 52.243-1 and 52.217-8, Option to Extend Services clause be used together to extend services beyond 6 months?
Can the CO allow technical evaluators to see the prices?
Can the CO delegate QA responsibilities to the local QA office or does it need to be delegated to a COR or DCMA?
Can the Contracting Officer set a deadline for submission of a Request for Equitable Adjustment
Can the Contractor ask for abandonment of Government property?
Can the Contractor Assume a Deliverable is accepted if the Government does not review in time period identified in CDRL?
Can the contractor charge OH and G and A on excess inventory not delivered or completed?
Can the contractor include preparation costs as part of demil costs?
Can the designated MDA waive the regulatory requirement for an APB?
Can the Government accept Gifts?
Can the Government allow a vendor to charge Costs on one IDIQ Task Order for similar work performed on a different Task Order under the same IDIQ?
Can the Government authorize the contractor to utilize the Federal Supply Schedule under a Cooperative Agreement?
Can The Government Award A Contract To The Lowest Bidder If All Bids Were Over The IGE / Government Bid?
Can the Government Purchase Card be utilized to procure lodging
Can the Government purchase ergonomic/special chairs for contractors?
Can the Government Recommend Contractor Support
Can the government require a prime to subcontract with a specific vendor for services?
Can the Government Take Clear Title to Performance Based Payment Inventory Anytime During Contract Performance, if a Bilateral Mod is Issued Identifying the Item as a CLIN in the Contract?
Can the Government Tell a Contractor when they can take leave and or dictate work schedule?
Can the Govt purchase used, remanufactured, reconditioned, or refurnished IT equipment used?
Can the GPC be used to pay for Civil Service employees Commercial Drivers License
Can the GPC be used to pay for surgery at the base Hospital
Can the GPC be used to purchase Group Lodging if it is under the micropurchase limit?
Can the GPC card funded by FMS funds be used to rent conferernec room and pay for food for Foreign Military Customer.
Can the GPC used to pay for professional organization membership dues?
Can the Justification and Approval be approved before a Milestone approval?
Can the NAVCOMPT 2275 be issued to an Army Command?
Can the PARC delegate authority to Division Chief?
Can the period of performance be BEFORE the effective date of the contract?
Can the Prime Contractor introduce a new sub contractor under Flowdown clause 52.244-4 for the same original scope of work
Can the Program Manager also be the Milestone Decision Authority?
Can the purchase of initial spares be a split procurement?
Can the total price/cost for non-recurring support significantly exceed the total price/cost for recurring support in an IDIQ FFP contract?
Can the USG permanantly turn over GFP to a contractor as a means of disposal upon termination of a contract?
Can this items be purchased outside the US?
Can thresholds be established for the submission of LDDTs?
Can TINA apply to FAR 12
Can two different contracts be awarded from the same direct cite MIPR?
Can UCA Be USED after Proposal Was already Submitted?
Can unused contract value from exercised option years be realigned to last unexercised option year?
Can vendors get past award information?
Can warranty of an item be an option?
Can we add a new severable CLIN for new work within scope that has a PoP that is different than the current CLINS?
Can we add a percentage escalation rate with a previous cost and pricing data?
Can we award to open market quotes placed through GSA eBuy? What differentiates an open market quote from a non-open market quote if there are both received through GSA eBuy in response to an RFQ on G
Can we buy commercial items directly from a foreign source
Can we decommit funds betwen bid receipt and award?
Can we dispose of or transfer Contractor Acquired Property through a property grant?
Can we exercise options for a task order after its basic contract expires for severable services?
Can we extend PoP of TO using Extension of Svc 52 217 8. the TO is about to expire and need extensio to work on new TO.
Can we have a COST CLIN on a Firm Fixed-Price contract, if the contractor does not have an approved accounting system?
Can we procure from within GSA Advantage from a Canadian company if their bid is the lowerest price?
Can we provide incumbent contractor name/phone to new interested vendors
Can we purchase a piece of equipment from another AFB
Can we purchase bottled water for an awards ceremony?
Can we purchase military items via a Government Credit Card
Can We Release an RFP with a Fixed Cost and Make Requirements the Variable?
Can we say that we can not use reimbursible funds under the Economy Act orders to obtain goods and services from OGAs and contractors but must use Direct Cite orders?
Can we simply, internally, fund our own modifications that require an increase with modifications that requires a decrease within the same contract?
Can we spend Procurement Funding before Type Classification?
Can we use O&M and RDT&E funds on one CLIN?
Can we use O&M to fund a repair that will be completed over 3 years?
Can we use OMA funds to fund multiple task orders to develop reports on an enterprise data warehouse?
Can we use Operations and Maintenance funding to purchase a SW license renewal exceeding 250k dollars.
Can we withhold PBPs until the Contractor gets back on schedule?
Can we, government withhold processing public vouchers received by the contractor?
Can you accept proposal revisions without extending the due date for offers?
Can you add clause 252.232-7007 at the time of an option modification
Can you add FAR 52.232-18, Availability of Funds, when exercising an option if done bi-laterally?
Can you add new option years into an existing contract?
Can you award a Blanket Purchase Agreement with an Economic Price Adjustment
Can you award to an LPTA vendor that did not respond to the solicitation
Can you buy a frame for military awards.
Can you change a CLIN type after award?
Can you compare pricing of a small business with the historical pricing of a large business
Can you convert a T&M CLIN into FFP CLIN after the contracts end date?
Can you create an area set-aside
Can you do a BOA or BPA for construction
Can you do a construction contract on a commercial form- SF1449?
Can you do a termination on a contract that has already expired
Can you do option in a undefinitzed contracting action?
Can you establish a BPA with 1 vendor that contains items that are open market to that vendor but available under FSS contract by another vendor?
Can you exercise a construction bid option item after the days stated in the contract?
Can you exercise an option after the date the base expires?
Can you exercise fixed priced ceiling priced production options without going back out for a firm fixed price proposal?
Can you extend services on a TO under 52.217-8 beyond the IDIQ expiration Date?
Can You Have FOB Origin with Inspection and Acceptance at Destination?
Can you include past performance as part of the evaluation criteria for an AbilityOne Solicitation?
Can you issue a no cost task order?
Can you issue a task order against an expired contract?
Can you just give Government Property to a Contractor without including it on the contract?
Can you leverage main system architecture for sub-system in NR-KPP development?
CAN YOU PAY FOR ANNUAL HARDWARE/SOFTWARE MAINTENANCE UNDER GCPC THRESHOLD
Can you please provide information on cost-sharing?
Can you procure Personal Award Decorations on PO? What funding should be used?
Can you purchase flowers/seeds on a GPC?
Can you purchase UNICOR furniture with just a MIPR?
Can you purchase vehicle parts using GPC?
Can you purge documents from a contract file in preparation of staging for storage
CAN YOU REALIGN FUNDS ON AN IDIQ FROM TIME AND LABOR TO MATERIALS
CAN YOU REINSTATE A SOLICITATION THAT HAS BEEN CANCELLED
Can you return to original Scope after Down-Scoping the PWS?
Can you send out a notice of intent one year in advance?
Can you terminate a contract without issuing a modification
Can you use both commercial clauses and construction clauses on one soliciation
Can you use Clause 52.249-10 for a unilateral time extension on a Construction Contract?
Can you use current year funds to reserve a booth in the following fiscal year in order to receive a price break?
Can you use form 1449 for a task order against a commerial IDIQ contract.
Can you use GPC Card for purchases from Amazon.com?
Can you use MIPA to fund obsolescence?
Can you use more than one FAR authority on a modifcation?
Can you use only FAR part 12 in acquisitions?
Can you use the GPC for the purchase of retirement awards, specifically plaques, for civilian personnel?
Can you use the SF 1449 for combined synopsis/solicitations, regardless of dollar value?
Can you use two current Construction Appropriations on one contract
Can you utilize Right of First Refusal for Advisory and Assistance Services Contracts?
Can you utilize the GPC to pay for Tolls
Can you utilize the GPC to pay for Tolls
Canadian Procurements
Cancel solicitation under FAR 12 and 15
Canceled DIDs
Canceled funds, deobligation, anti-deficiency
Canceling a BPA
Canceling a RFQ
Canceling Funds
Canceling Funds - Replacement funding alternative, using a different ACRNs excess/remaining funds
Canceling procurement after proposal submission
Cancellation authoritiy to cancel a TO under the wrong IDIQ and reissue it under the correct IDIQ.
Cancelled Appropriation
Cancelled DIDs
Cancelled Year Funds
Cancelling a solicitation
Cancelling a solicitation on eBuy
Cancelling appropriations vs ADA
Cancelling funds
Cancelling Funds
Cancelling requirements
Cannibalization is it legal for the contractor to take parts
Cannibalization vs. Rent Free Use
Cannot Determine Price Fair and Reasonable
Cannot find a PSC for Childcare Services
CAP and PMSA
Cap for outside workers
CAP purchased with a PCard for a Cost Reimbursable type IRAD Contract
CAP Transfers to Another Contract
CAP, GFP and Investment Threshold
Capabilites Development Document Role in Disposal/Final Disposition
Capabilities Based Assessment and Gap Analysis
Capabilities Production Document
Capability Development vs. Combat Development
Capability Insertion and Improvement
Capability transition from PMO to Operations
CAPE WBS Policy
Capital Improvement
Capital Investment Program Funds Reimbursable Dollars Crossing FY??
Capital Type Rehabilitation
Capitalization of Indirect Costs Related to Software Developed for Internal Use
Capitalization of the word contractor in a SOW or PWS
Captain as Contract Adjudicator
Capturing an incumbents personnel
Capturing Baselines for a system in the Operations and Support phase
Capturing Costs of Special Tooling
CARD Requirements
CARD-like document
Carrier based Mean Logistics Delay Time
CAS 406 and CAS in General
CAS 406 concern?
CAS 406 transitional period
CAS 417 recovery methods
CAS 418 Pre-established Rate for Labor
CAS Applicability for non-Commercial FFP contract
CAS Applicability of IDIQ contracts
CAS Applicability on IDIQ MATOC
CAS applicability to LB subcontractors under SBSAs
CAS- Change frorm a CAS noncompliant practice to a CAS compliant Practice
CAS Compliance
CAS Compliance - Allocating Corporate Direct Labor Costs to the Contract Level
CAS compliant
CAS Covered Contracts
CAS Noncompliance
CAS Noncompliance Cost Impact legal question
CAS Requirements on a Federally Funded Subcontract
CAS Services
CASB DS-1 Disclosure Statement Instructions
CASB Regulations
CASREP Clauses
CASS waiver process and Depot stand up decision
CAT 1 Transportation
Catagory Determination
Cataloging know obsolete parts
Categories of funds and what you can spend them on
CATEGORIZATION OF ST AND STE
CBA & WD- DOL User's Guide
CBA Language for SOW Section L
CBA or SCA Wages for Wage Determination
CC 52.252-4 Alterations in Contract
CCA applicability
CCA Compliance
CCASS Rating
C-Contract with an IDIQ CLIN?
CCTV as an Expense/Investment
CDD Affordability documents and O and M Acquisition costs from O&M Operations costs
CDD or CPD requirements for IT
CDD Question
CDD releasability
CDDs for every operational class of ship
CDR
CDRL blocks
CDRL DD250 Requirement
CDRL Exhibit - CLIN Linkage
CDRL Software - GOTS or COTS
CDRL vs Contracts Letter
CDRLs
CDRLs
CDRLs and Document Summary
CDRLs for EV not DID Compliant - Near end of PoP of contact
CDRLS in PWS vice DD1423
CDRLs Instituted At The Task Order Level
Ceiling for Delivery Order Type Contracts
Ceiling Increase
Ceiling increase allowed to new threshold when 8a contractor has graduated the program?
Ceiling Labor Rates on a CPFF CLIN
Ceiling on FFP Production Contract?
Ceiling Price
Cell phones and blackberries in materials list
Center of Exellence
Central Technical Support Facility testing for interoperability certificaton
Centralized Access for Data Exchange (CAFDEx®) Suite
Centralized vs Decentralized
CERP contracts and Liquidated Damages
Certificate of Completion
Certificate of Conformance Signature
Certificate of Cost and Pricing
Certificate of cost or pricing data
Certificate of Current Cost and Pricing
Certificate of Current Cost or Pricing Data
Certificate of Current Cost or Pricing Data Required
Certificate of Insurance
Certificates of Conformance FAR 52.246-15 Test items/CDRLs
CERTIFICATION ACSA
Certification action
Certification and Accreditation
Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions
Certification and qualification training
Certification at the order level
Certification for International Career Path
Certification of Funding Availability for FPI Type Contracts
Certification Requirements for J-Std-001
Certified Acquisition Professional
Certified bank check in lieu of Payment Bond
Certified Cost and Pricing Data
Certified Cost and Pricing Data
Certified Cost and Pricing Data
Certified Cost And Pricing Data
Certified Cost and Pricing Data
Certified Cost and Pricing Data
Certified Cost and Pricing Data
Certified Cost and Pricing data
Certified Cost and Pricing Data for modifications of Design-Build Construction Contracts
Certified Cost and Pricing data on a competed single award IDIQ contract
Certified Cost or Pricing Data
Certified Cost or Pricing Data Needed for Ceiling Increase Modfication for Engineering Services Contract/CPFF
Certified Cost or Pricing Data Needed for Ceiling Increase Modfication for Engineering Services Contract/CPFF
Certified Cost or Pricing Data Needed for Ceiling Increase Modfication for Engineering Services Contract/CPFF
Certified Funds and Budget
CERTIFIED PAYROLL REQUIREMENTS UNDER CONSTRUCTION CONTRACTS
Certified Payrolls Labor Classification
CFR title 48 vs FAR
CFSR for Subcontractors
CGPC and provisions/claues
Challenging a sole source justification before closing
Change an existing Single Manager program management construct to a JPO
Change clause to extend the project completion date based on COVID-19
Change currency in the same contract
Change from Progress Payment to Performance Base Payment
Change in Accounting Method
Change in Advertisement Set-aside
Change in approved accounting system
CHANGE IN BUSINESS SIZE DURING PERFORMANCE OF A CONTRACT
Change in Business Size Status Under Multiple-Award SDVOSB Set-Aside BPA
Change in delivery location
Change in Order
Change in PRICE or OBLIGATION ?
Change in scope of requirements leading to the removal from 8a program
Change in size representation after proposal but before award
Change in specification
Change of Address
Change of assignment versus TDY
Change of contract type
Change of Corporate Structure on Existing Federal Contracts
Change of Name Agreement
Change of name on a contract
Change or addition of personnel position in cost type contract
Change Order for Delays Outside of Contractor Control
Change Order Mark-up Rates on Service contracts
Change Order vs. Supplemental Agreement
Change proposal vs redistribution of costs due to make/buy decisiion
Change Synopsis for Latest Update to DAG Chapter 8
Change TASK in SOW
Change TIN to EIN
Change to department of labor wage determination
Changes in Cost or Pricing Data FAR requirements for DOD & NASA
Changes in terminology and guidance throughout the years.
Changes to Force Activity Desinator
Changes to Interim DoDI 5000.2
Changes to Task orders after Basic Ordering Agreement Expiration
Changes to the Performance Envelope
Changing a commerciality determination to non-commercial
Changing a contract from FFP to LH
Changing a COST CLIN to a FFP CLIN
Changing a MIPR from Economy Act Order to Project Order
Changing a pay office in a contract through modification
Changing a Product Service Code - PSC
Changing a Reparable to a Consumable Item
CHANGING CLASS OF SUPPLY AFTER APPLYING AN MWO
Changing Competition from a FAR 16.5 to a FAR 15
Changing Contract Accountability
Changing Contract Type
Changing Contract Types
Changing Contract Types: Cost-Plus Incentive Fee to Firm Fixed Price?
Changing CPFF CLINs to FFP
Changing currency on awards
Changing Depots
Changing FPIF to FFP
Changing From a 5 Year Solicited Award to a 2 Year Award After Vendor Selection
Changing of Proposed Key Personnel After RFQ Close Date
Changing Periods of Performance Under Service Contracts
Changing PSC and NAICS Codes
Changing Requirement
Changing the PMB at the conclusion of the IBR
CHANGING THE TYPE OF A SUBCONTRACTING PLAN
Chapel Spiritual Retreats
Charging contract labor to a contract that does not have any contract labor authority remaining
Charging Depreciation Expense Directly to the Contract
Charging domestic administrative work to an active FMS case.
Charging ODC items to Labor CLIN
Charging Travel Cost and Labor Time
Checking for formal logistics terms/definitions when describing new Construction
Chemical Removal Liability
CHESS
CHESS (ID/IQ) Subcontracting Plan
CHESS Buy
CHESS Buy
Chess Buys
CHESS Clauses
CHESS Market Research
CHINFO
Choice of Contracting Office
Choosing Appropriate System Engineering Methodology/Approach
Christian Doctrine Applicable to Part 12 Contracts?
Christian Doctrine for Firm-Fixed Contracts
CICA Applicability to IDIQ Delivery Order Modifications
CICA Application to Modifications of Commercial Contracts
CICA Requirements in a Contingency Environment
CICA Violation
CICA Violation
CIF Clothing Record / Hand Receipt
Cisco Unified Communications 9.0 Licensing
Citation for WCF Return of Customer Funds After UnderBurn
CITE vs. TASMG
Citing 10 USC 2304a as Contract Mod Authority / Uni Vs Bilat Changes Under Changes Clause
Citing Multiple FAR 6.302 Authorities in a JOFOC
Citing Regulations in PWS
Civil law adherence
CivPay or Operations and Maintenance for GS Employees?
CL V sustainment
CLA vs. CDA (Core Logistics Analysis vs. Core Depot Assessment (CLA/CDA))
Claim for Stolen Equipment
Claim Payment
Claim withdrawal effect on issued COFD
Claim, Uninvoiced
Claim/Request for Equitable Adjustment
Claiming Cost incurred on Material ordered but cancelled
Claims resolution
Clarification of Approving Officials
Clarification of property ownership - cost type prime contract
Clarification of The Definition of New Marterial
Clarification of the IMM Program in DFARS PGI 208
Clarification of Time and Material
Clarification on a New Start
Clarification on Answer to
Clarification on Exception to Synopsis FAR 5.202(a)(13)
Clarification on NCM question
Clarification on Type B Contract Requirements
Clarification or Discussion when using FAR Part 8
Clarifications
Clarifications
Clarifications versus Discussions
Clarify previous question and answer
CLARIFY PROVIDE OR FURNISH FOR SUBCONTRACT PERFORMANCE
Clarifying property ownership
CLARITY OR TERMINOLOGY USED
Class Action J&A
Class Brand Name Justifications
Class Deviation effective dates
Class Deviations
Class Deviations
Class I ECP Criteria
Class J and A
Class J and A for unpriced Over and Above work
Class Justification and Approval
Class V unescorted access
Class VII Major Items and Operator Manual
Classification of Reparables
Classification Variance
Classified Delivery Orders or Task Orders under Multiple Award IDIQ
Classified documents for MIPR review
Classified GFP and EDA
Classified/escort services
Clause
Clause 252.211-7003, and 252.211-7008
Clause 52.217-8
Clause 52.232-22 Limitation of Funds
Clause Flowdown versions to Higher Ed
Clause GSA 552.212.4 CONTRACT TERMS AND CONDITIONS COMMERCIAL ITEMS
Clause incorporated into task orders
Clause Matrix and Referencing Clauses in FAR 15 UCA format
Clause Matrix-blank column not applicable?
Clause Selection Depending on Contract Type
Clause to notify contractor
Clause to prevent buy-in
Clause Use
Clauses in ID/IQ contracts
Clauses in Regards to Grey Market
Clauses in the Basic Contract
Clauses incorporated by reference
Clauses/Provisions - No Cost Contract
CLC 22
CLCS
Clearly Defined Requirements for a Detail Specification
CLIN adjustment on a CPIF Contract Overrun
CLIN Establishment After Contract Award
CLIN numbering on task orders
CLIN relationships
CLIN Setup for Fixed Price with Prospective Price Redermination
CLIN Structure
CLIN Structure
CLIN structure and funding amount
CLIN Structure for Data Rights - Use of NSP CLIN
CLIN to Handle Deficiency Reports on Production Contracts
CLIN USAGE
CLIN/SLIN structure
CLIN/SLIN structure is too large for electronic procurement system to handle
Clinge-Cohen Act Compliance for Defense Business Systems
Clinger Cohen Act and Telephones
Clinger Cohen Requirements
Clinger-Cohen Act
Clinger-Cohen Act
Clinger-Cohen Act
Clinger-Cohen Milestone document requirements
CLINS for -8 Extension
CLINS REQUIRED FOR A RFP - SOLE SOURCE CONTRACTING
CLINs Stand alone WRT Individual Funding and Invoicing
Close Out
Close Out
Close out and deobligations
Close Out Citation under Block 13
Close out Dollar Value
Close-out Action
Closeout and Litigation
Closeout de-obligation amount
Closeout of completed Base Year
Closeout of cost type contract when contractor owes
Closeout of orders under SAT
Closeout where Contractor is no Longer In Business
Closeout with Open Demand For Payment
Closing a cancelled contract
Closing a contrat with Patent
Closing a cost type contract with a NULO
Closing Contracts that have been final delivered but have a warranty
Closing OTAs in Litigation
Closing Out Contracts and DBA Insurance
Cloud development and the FedRAMP SDLC requirement
CLS vs Non-CLS Proper Funds for Product Support Integrator (PSI) contracts
CMMI Level 3 certification requirement
CMQ intent/direction?
CMR Threshold
CMRA program
CO and CA Negotiation Authority
CO decision vs Activity decision
CO issuing telephone or electonic instructions under FAR 47.305-10
CO requiring sole source justification for a its Prime Contractor to exercise an optoin
CO vs. KO
COA Development Training/Facilitators
Coalition partner pacticipating on the Technical or Past performance teams US Source Selection
COE Contracts and Use of WAWF
Coefficient Question
COI and COICs for an ACAT IV M program with no Operational Testing
COIC Form Certificate Of Installation Completion
COLA
Collecting Fees
Collection and Deposit Review
Collection of Liquidated Damages from a FP subcontractor under a CPFF prime contract
Collective Bargaining Agreement
Collective Bargaining Agreements
Collective Bargaining Agreements - CBA
Collective Bargaining Agreements and Wage Determinations
Color of funding for PQT
Color of Money
Color of Money
Color of money for leasing
Color of money for Pubs on fielded A/C being modified
Color of money to purchase
Colors of money
Combat Developer for Non-Service User
Combatant Command of Forces Under Service Secretary Administratvie Control
Combined contract with FFP CLINS and Cost CLINS for progress payment
Combined FFP/FPIF Pricing Arrangement and SPS CLIN Input for Award
Combined service and supply contract
Combined Supplies and Services Purchase on GCPC
Combined synopsis for Construction
Combined Synopsis/Solicitation
Combined synopsis/solicitation above commercial threshold
Combined Synopsis/Solicitation Procedures
Combined Synopsis/Solicitation Procedures
Combining Army, AF, Navy, and Marine Corp requirements for Type Classification, Materiel Release, Fielding, and Transfer
Combining Contract Types
Combining efforts under IDIQ
Combining Task Orders Under the Same BPA
Comingle defined
co-mingling FMS funds and USG funds on repair contract
Co-mingling of FMS and Army owned assets
Co-mingling of OM anf RDTE funds
COMM Installation
Command relationship between DASN RD and A and Marine Corps Systems Command
Commercial Ammunition for Competitive Marksmanship
Commercial and DLA pricing
Commercial and Non Commercial Services Aquisition
Commercial Clauses
COMMERCIAL CLAUSES ON IT SUPPORT CONTRACT AWARDED IAW DOD SSP
Commercial Contract & Cost Reimburseable CLINs
Commercial Contract Clauses
Commercial Contract Quality Assurance Requirements
Commercial Contract Termination Alternatives
Commercial Contracts - Inspection
Commercial Contracts and Contractor Manpower Reporting Requirement
Commercial Database Subscriptions---Acquisition of Computer Software or Not?
Commercial Equivalencies to DAU Contracting / Acquisition Levels II and III
Commercial Hybrid FFP and TandM Incremental funding
Commercial Interim Payments
Commercial item covers IT
Commercial Item definition in use of T& M-LH contracts
COMMERCIAL ITEM HANDBOOK
Commercial Item Handbook 2.0
Commercial Item or Not
Commercial Item Price Reasonableness Determination
Commercial Item Threshold
Commercial Items
COMMERCIAL ITEMS
COMMERCIAL ITEMS
Commercial Items
Commercial Items Handbook Version 2.0
Commercial or Non-Commercial?
Commercial Pricing and Dealer network and price lists
Commercial Professional Services
Commercial Sales to Foreign Goverments
Commercial Services with Travel and ODCs GSA OASIS and GSA PSS
Commercial Software Maintenance - Severable or Non-Severable
Commercial Solicitation for either remanufacture or new item
Commercial Source Selection
Commercial versus non-commercial services
Commercial versus Non-Commercial Services
commercial vs non-commercial supplies or services
Commerciality Definitions
Commerciality Determination
Commerciality Determination
Commerciality Determination for UXO services
Commerciality Determinations
Commercila Area Announcement
Commerical Acquisition Modification Authority
Commerical and non-commerical designations for the same product
Commerical Customers
Commerical item
Commerical Items
Commerical SAP regulations
Commerical Vendor or from EMALL or GSA Advantage
Commissioning a Painting
Commissioning an Artist
Commitment
Commitment of funds for base plus options
Commodities Modification
Common Control
Common Items - Terminate for Convenience
Common Support Equipment
Communication with offerors in a two phase construction contract
Communication with Offerors after Receipt of Proposals
Communications between two contractors
Communications during contract with two or more competing contractors
Communications wire purchased separately rather than part of a MILCON
Communications, Clarifications and Discussions
COMMUNION BREAD AND WINE
Commuting vs. Travel and Associated Costs
COMNAVAIRLANTINST 9080.2
Comparing a Proposal Against Other Proposals in Source Selection
Comparing DoD/Federal Acquisition Process Steps to Commercial Equivilent
Comparing GSA Prices to Determine Fair and Reasonableness
Comparing GSA pricing vs Open Market pricing for Price Analysis
Comparison of milestone map under RMF and DIACAP
Compeditive Procedure Small Business
Compensable time with Variations in Estimated Quantity modification
Compensated Overtime
Compensation Caps for 2013 and 2014 prior to June 24, 2014
Compensation for excess units within Variation in Quantity under FAR 52.211-16
Compensation for Losses under Disapproved Business System
Compensation for Personal Services Tax Gross Up
Compensation Plan
Competed LTA as Adequate Competition in Subcontracting when over TINA
Competing a Time and Material Contract
Competing A-E Multiple Award IDIQ Contract Tasks
Competing an 8a
Competing BPAs Price Lists
Competing First Time Buys When Only One Source
Competing for Architect and Engineer Services among GSA Contractors
Competing security requirements
Competition
Competition
Competition
Competition
Competition
Competition
Competition - Correction to submitted question 109046
Competition Advocate Reviews for Acquisition Planning
Competition after Award
Competition among other DoD organizations
Competition Awards
Competition Cost Analysis requirement exemption
Competition Effects on Cost
Competition of Blood and Blood Products
Competition Requirements in Federal Government Subcontracting
Competition Templates and Samples
Competition Vs. Teaming
Competitive 8a repsonses over the limit
Competitive 8a Requirements
Competitive Buy for X Number of Widgets Not to Exceed X dollars
Competitive Contracting - Fee Percentage
Competitive Marksmanship and Biathlon Ammunition Operations
Competitive One-Bid when Cost Realism is Performed
Competitive prototyping
Competitive Range
Competitive Range - Can it be determined prior to a cost realism analysis?
Competitive Range Determination
Competitive Range Determination Required Prior to Holding Discussions under FAR Part 13?
Competitive Range exclusion and re-inclusion?
Competitive Strategy
Competitive threshold for multi award 8A GWAC
Complete list of BBP acquisition document templates
Completed example BCA
Completed Final CPARS
Completing CDRL DD Form 1423 Blocks G and I
Completion date precendence Cure vs. Show Cause
Completion of the FPDS-NG CAR
Completion Task Order Execution
Completion vs Term contract
Completion-Based Technical Task Orders
Compliance Issue
Compliance versus Intent
COMPLIANCE WITH A GSA SCHEDULE
Compliance with Federal EVM Regs. and Mandates
Comply with the UID requirements
Component Acquisition Executive Approval
Components of End Item
Composite Rates
Compressed Gases
CompTIA Certification Maintenance Fees
Compuer assembled into a Video Broadcast system
Computer and Software Security Plan
Computer License
Computer Resorces Life Cycle Management Plan
Computer Resources
Computer software tangible personal property
Comsec equipment
Concept for Awarding Service Contracts with JIT Funding
Concept of Employment vs Concept of Operations
Concept of Operations document
Concept Plan
Concerning ACTS OF GOD
Concessionaire Contract
CONCESSIONAIRE CONTRACT IN KIND
Concurrency
Concurrent Funding
Concurrent use of special conveyance, i.e., rental car, by government and contract support members of a program office inspection team.
Condition Based Maintenance for Training Devices
Conducting a COTS Software Pilot
conducting a services source selecting without haveing surity of funds.
Conducting additional research/fact finding regarding the definition of Fielding
Conducting negotiations on a FFP IDIQ task order contract
Conference Fee Payment
Conference fees
Conference Funding
Conference Planning
Conference setup fee
Confidence level
Confidence levels in mission requirements?
Confidential/ Secret buying
Configuration change question
Configuration Control Board (CCB)
Configuration Management Plan, Life of Document
Configuration Management Return on Investment
Configuration Management-Use of MEARS
Configuration Steering Board Replacing Configuration Control Board?
Configuration Steering Board Requrements
Confirmation of Negotiations
Conflict between 40 USC 3131 and FAR 28.102-1a
Conflict of interest
Conflict of Interest
Conflict of Interest
Conflict of Interest
Conflict of Interest
Conflict of Interest
Conflict of Interest Between P Card Holder and Funds Certifier
Conflict of Interest with AE Services
Conflict of regulations
Conflicting Information
Conformed contract at time of award
Congressional activities in the acquisition process
Congressional Directed Funds
Congressional Directed Funds and Final Indirect Rates
Congressional Mark
Congressional Marks and Reprogramming Actions to recover funds
Congressional Matters - Terminology
Congressional Notice Requirements
Congressional Notification
Congressional Notification
Congressional Notification
Congressional Notification
Congressional Notification (CN)
Congressional Notifications
Congressional Notifications
CONOPS versus CONEMP
Consent of Surety
Consent to Subcontract
Consent to Subcontract approval needed.
Consent to Sub-contract how is 5 percent threshold for subcontractor applied?
Consider each individual contract on its own dynamics
Consideration
Consideration
Consideration - Can it Cross Option Years?
Consideration / Late Delivery
Consideration for Failed FAAT and Delay to Contract Schedule
Consideration for late delivery - does the scope of the contract have bearing on the consideration requested by the government?
Consideration for no-cost extensions on Cost type contracts
Consideration in Lieu of Liquidated Damages
Consideration to Loyal Vendors
Consideration/Remediation for Missing Delivery Date or Non-Performance
Considering late responses on a non-commercial SAP RFQ
Consignment Agreement
Consignment Contracts
consolidate purchasing item and majntenance service
Consolidated Bill of Material Proposal Requirements
Consolidated Buy
Consolidated O and M Support Contract
Consolidated Project Plan CPP
Consolidating mutiple service contract under one contract vehicle
Consolidation
Consolidation and Bundling
Consolidation and Bundling of Contracts
Consolidation Memo
Consolidation Memo for Construction of C-17 Facilities under FMS
Consolidation Memo sample
CONSOLIDATION OF CONTRACTS
Consolidation Requirements for orders placed against a single agency BPA
Constitutional and statutory for contracting
CONSTRUCTION - IRREVOCABLE LETTER OF CREDIT
Construction Authority to use Submittals in lieu of Contract Data Requirement Lines - CDRLs
Construction Award against GSA
CONSTRUCTION BENEFICIAL OCCUPANCY CONSIDERATION IN TIME IMPACT ANALYSIS
Construction Change Order Proposal Allowable Cost
Construction clauses in a supply contract
Construction Contract Deliverable
Construction Contract Modification with Incentive
Construction Contract Period of Performance
Construction Contracting
Construction Contracting
Construction Contracting - Time Extension Request
Construction Contracting Modification Authority
Construction Contracting-Incentive Contracts
Construction Contracts, Progress Payments, and Accounting Systems
Construction Determination
Construction Field Overhead
Construction Flight Chief and Contracting Officer
Construction IDIQ
Construction in a Services Contract
Construction Market Research
Construction Materials
Construction MATOC, Consolidated contract?
Construction Modification emergency repairs without funding
Construction MPT
Construction NAICS/PSC for a commercial commodity with install.
Construction or service
Construction or Service
Construction or Service or Both
Construction or Supply/Installation service contract
Construction oversight at GOCOs
Construction Performance Bonds
Construction Period of Performance Table
Construction Period Services and Commissioning
Construction Phase Services for A-E Task Orders
Construction pre-proposal meetngs
Construction Progress Reports and the FAR
Construction Project - Soliciation Response Time
Construction project extends behond POP end date,
Construction Schedule Cost Loaded Items
Construction Schedule Cost Loaded Items
Construction Site Labor Interview
Construction Solicitation and FAR 52.208-9
Construction under an IQC with Architect and Engineering FAR clauses
Construction under Assistance
Construction under FAR 13
Constructive Change vice Unathorized Commitment
Constructive change?
Consturction using FAR Part 12
Consumable vs DLR $ Threshold
Consumables at the Depot Level of support
Contingency Contracing Funding
Contingency Contracting
Contingency Contracting COR reporting requirements for AAFES
Contingency Contracting in Indonesia
Contingency Contracting Missions in the last decade.
Contingency Liability
Contingent Liabilities and Contractor Overruns
Contingent Liability on a Cost Plus Award Fee Contract
Continue with contract after owner of the SDVOSB had died
Continued Contracts - DFARS 204.7001.c
Continued Service
Continued support services for license-hardware previously purchased
Continued use after lease expired
Continuing Resolution
Continuing Resolution and 12-month Contracts
Continuing Resolution Authority
Continuing Resolution Authority (CRA) 'Overseas Contingency Operation (OCO)
Continuity of Service Clause
continuity of services
Continuity of Services in the CLIN structure
Continuity Plan
Continuous Engineeing Approach?
Continuous Engineering
Continuous Learning Modules
Contracct Extension
Contract Delivery, Period of Performance and Contract Property Closeout
Contract Action Lead Time CALT
Contract Admin functions
Contract Administration
Contract Administration of BPA that is missing clauses 52.217-8
Contract Administration Office QA Responsibilities on 52.246-9008
Contract Administration. Partial Delegation and SF33 Annotation
Contract and Funding Course
Contract Attachments and EDA
Contract Award
Contract award
Contract Award Document distribution
Contract Award or Modifications Never Signed by Vendor
Contract Award to Incorrect DUNS and CAGE
Contract Award Types Lowest Price Technically Acceptable vs. Best Value
Contract Capacity
Contract Ceilings
contract clauses
Contract Clauses Application
Contract Clauses in the IDIT Contract vs. Task Orders
Contract Clauses Vs PWS
Contract Closeoup
Contract Closeout
Contract closeout
Contract Closeout
contract closeout
Contract Closeout
Contract Closeout - Removal of Excess Funds Modification Authority
Contract Closeout Audits
Contract Closeout Auto Close
Contract Close-out requirements
Contract Closeouts
Contract Closeouts: Responsible Official
Contract Completion Statement Form DD1594, Feb 70
Contract Considerations for deliveries beyond the period of performance
Contract Containing PGI 204.7108 252.204-0005: Line Item Specific: by Cancellation Date
Contract conversion
Contract CPARS evaluation expectations
Contract Data Requirement List (CDRL)
Contract Debriefings
Contract Definitization Clause
Contract Deliverable Sell Back
Contract delivery Schedule - deliquency
Contract Delivery, Period of Performance and Contract Property Closeout
Contract Descope
Contract Discussions
Contract duration
Contract Duration greater than 5 years.
Contract Employee Time Cards
Contract employees alone in building
Contract Execution - Early Exchanges
Contract Expenditures/Invoicing against "expired" funding
Contract expiration notice
Contract expiration while awaiting another government agency approval
Contract expiring not much time
Contract extensions
Contract for Contracted Personnel
CONTRACT FOR SERVICES
Contract for unallowable service and modfication
Contract Funding
Contract Funding
Contract Funding
Contract Has No Ceiling But Plenty Ordering Periods Left On Contract
Contract is for Unclassified Requirement but Task Order is for Classified Requirement - DD 254
Contract Kinds
Contract Law
Contract Law Option Exercise
Contract Manpower Reporting
Contract Manpower Reporting
Contract Mod effect on FTEs
Contract modification
Contract Modification
Contract Modification
Contract Modification - Contracting Officer warrant threshold
Contract Modification and GPC
Contract Modification Cost Charging for Bid & Proposal (B&P) Activities
Contract Modification Narratives
Contract modification past the expiration date
Contract Modification to Update Equipment Listings
Contract Modification with Two Different Appropriations
Contract Modifications - DODAAC Changes Unilateral or Bilateral?
Contract Modifications and PNM Requirements
Contract Modifications -Equitable Adjustments
Contract Negotiator
Contract Number Components
Contract Number on Documents
Contract Obligation and de-obligation of Funds
Contract Obligation Realignments Involving Expired Appropriations
Contract Obligtations
Contract Officer
Contract Patent
Contract Payments to Small Businesses
Contract Peformance Rating
Contract Performance Period Rules with Incremental Funding
Contract Period Limitations for Information Technology Contract
Contract POP and CRA
Contract Price Adjustment for Conformed Wage Determination
Contract Price Error
Contract Procurement Method Change
Contract Program Manager Overstepping Boundaries
Contract Requirement De-Scope brought on by Funding Cuts
Contract requirements for property accountability
Contract Review Board - Participant
Contract risk mitigation for privileged IT users
Contract signature
Contract Signature Process
Contract Specialist
Contract Specialist
Contract Specialist
Contract Specialist
Contract Specialist
Contract Staffing
Contract Strategies under CRA
Contract Structure
Contract subject to approval by higher authority?
Contract termination
Contract Termination
Contract Termination with transfer of property to another Government Contract
Contract to remove concrete and recycle asphalt for zero overall cost
Contract Transfer from FFP to FFP - Company-owned becomes Gov-owned
Contract Transiton and Severable Services contained in the same task order
Contract Type
Contract Type
Contract Type
Contract Type
Contract Type
Contract Type above the SAT
Contract Type Codes
Contract Type Codes
Contract Type for a Sole Source 8a
CONTRACT TYPE FOR FULL SERVICE CAFETERIA
Contract Type for Indefinite Delivery, Indefinite Quantity, Unknown Period of Performance
Contract Type for Laundry Services
Contract type guidance
Contract type guidance
Contract type indicator letter for hybrid contract
Contract Type Transition Modification Authority
Contract Type versus Proposal Instructions
Contract types
Contract Types
Contract Types Chart
Contract Types with University Affiliated Research Centers UARCs
Contract Value
Contract value/contract award value
Contract vehicle without having to bid
Contract versus Purchase Card
Contract vs cooperative agreement
Contract vs. JTR/JTFR
Contract Work Orders
Contract/Contractor Change Over Best Practices
Contracted Employees and Government provided equipment
Contracted support in place of COR
Contracting
CONTRACTING
CONTRACTING
Contracting Authority vs Systems Changes
Contracting- Bonafide Need Rule-Performance
Contracting by Negotiation
Contracting Channels, PEO Portfolio versus Other Contracting
Contracting claiming Government is de-scoping IDIQ TO to FFP work order to save money.
Contracting Dilemma
Contracting for a service requirement that is required every other year
Contracting for Commercial and Non-Commercial items
Contracting for Conferences
Contracting for Construction or Construction Material?
Contracting for equipment storage facility/warehouse
Contracting for Provisioning Data under new GEIA 007 Standard
Contracting for services today for a future FY
Contracting for Unknown repairs
Contracting in Foreign languages
Contracting Invoicing
Contracting Letter versus Contract Modification for Common Use of GFP
Contracting modifcation
Contracting office Co location conflict of issue.
Contracting Officer
Contracting Officer
Contracting Officer
Contracting Officer Appointment Letter
Contracting Officer Authority and Mission Needs
Contracting Officer discretion on promoting competition
Contracting Officer Limited Only to Signing Vendor Agreements
Contracting Officer Representative
CONTRACTING OFFICER REPRESENTATIVE
Contracting Officer Representative and Contract Monitor Security levels
Contracting Officer Representative Location
Contracting Officer Signature Block Contents
Contracting Officer Signature Blocks
Contracting Officer warrant limitations for deobligations
Contracting Officer warrant requirement
Contracting Officers Representative
Contracting Officer's Representative
Contracting Officers Representative and DAWIA
Contracting Offloading
Contracting Question
Contracting Specialist
Contracting subject matter experts
Contracting supplies for use outside the United States
Contracting to NPO NonProfit Organizations
Contracting Type for Repairs
Contracting Type in a CPFF or CPIF Scenario
Contracting types for reimbursable supplies
Contracting with a foreign country
Contracting with a Foreign Government
Contracting with a state agency
Contracting with Canadian companies/vendors
Contracting with Canadian companies/vendors
Contracting with Canadian vendors directly
Contracting with Company who has Federal Debt?
Contracting with Foreign Company
Contracting with FPI
Contracting with Non-Profit Who's Proposing CRADAs with Government. Agencies
Contracting with one requirement but two different GWACs
Contracting with Qualifying End Countries
Contracting-SME Allowed to Visit Site
Contractor
Contractor - Sole Owner
Contractor Access to Government Developed Technology - GOTS
Contractor Access to Government Financial Information
Contractor access to the DoD supply system
Contractor accountability/recall during an emergency situation.
Contractor Acquired Property
Contractor Acquired Property and Classification
Contractor Annual Report of Property
Contractor Assessment Performance System
Contractor Assistance in Preparing a Procurement Package
Contractor Assumptions in a proposal
Contractor Authority to order, receive and pay for goods/suppliesw
Contractor Authorization to work at risk?
Contractor Bankruptcy
Contractor building product well in advance of contract award
Contractor CAC Sponsor
Contractor CAC, can the expiration date go beyond the funding period.
Contractor Cancels Travel Due to Emergency
Contractor changes to clauses
CONTRACTOR COMPLETED WORK WITH NO DIRECTION FROM KO
Contractor Conducted sale of GP?
Contractor conflict of interest impeding competition
Contractor damaged government property during construction contract
COntractor disbursement timeframe
Contractor Disclosure of Mods, Deviations, Waivers, Alterations
Contractor Discrepancy Report
Contractor Dress Code?
Contractor Email Correspondance
Contractor Employee Compensation Cap per BBA
Contractor Employees donating money to charity for time off
Contractor Exemption from Puerto Rico state taxes on federal govt contract
Contractor Exit Interviews
Contractor Field Service Representative
Contractor Final Release
Contractor Funds Status Report CPSR
Contractor Furnished Equipment and DMSMS responsibilities
Contractor Grants Manual
Contractor has an Affiliate relationship
Contractor holding onto GVT money for DCAA rates.
Contractor incumbent information
Contractor Inspection System Acceptability
Contractor Insurnace Requirments for Government Trailer
Contractor Inventory Control Point sending property to be repaired under another Prime Contract
Contractor Inventory Disposal – Time Bound 52.245-1(j)(1) and (3)
Contractor invited to PCO retirement
Contractor Invoice Deadline/Disbursement limits
Contractor Invoicing
Contractor is looking to change their percentage of profit on an upcoming mod from the original amount that was on the contract.
Contractor liability
Contractor Liability
Contractor License
Contractor Logistics Support
Contractor Logistics Support (CLS), Interim Contractor Support (ICS) and Performance Based Logistics (PBL)?
Contractor LTDD check remittance
Contractor Manpower Reporting
Contractor Manpower Reporting
Contractor Manpower Reporting
Contractor Manpower Reporting
Contractor Manpower Reporting on Supplies
Contractor Manpower Reporting Pricing
Contractor Manpower Reporting requirement exemptions
Contractor manufacturing Job Traveler information
Contractor new Business Fee
Contractor OCONUS LOA
Contractor offers Government a credit on a new contract for scrapping 2 old generators.
Contractor Ordering Official
Contractor Out of Business
Contractor Overseas Allowances
Contractor Owned installed on GFE?
Contractor Owned Property on Government premises
Contractor owned scrap needing demilitarization
Contractor Past Performance
Contractor pay during base closure
Contractor PCS/Household Goods Movement Expenses
Contractor Performance Assessment Reporting System
Contractor Performing Construction Contract Without Approval and Notice to Proceed
CONTRACTOR PERFORMING WORK PRIOR TO EXECUTED CONTRACT
Contractor Procurement Manual and Prime Contract Legal Order of Precidence
Contractor Proposing a Price for NSP CDRLs
Contractor proposing as a prime and major subcontractor for a multiple award IDIQ.
Contractor Proprietary Markings
Contractor provided equipment
Contractor providing service and getting paid after contract expiration
Contractor Purchase of Contractor-Acquired Property
Contractor Purchased Vehicles included in Indirect Costs?
Contractor QCP Requirement in Commercial Services Contracts
Contractor Rate Holdbacks under a CP contract
Contractor Reason for Leaving Contract
Contractor Refuses to Sign Bi-lateral Modification
Contractor Reimbursement of foreign per diem rates given fluctuating rates of exchange.
Contractor Reimbursement to the Government
Contractor Relationships
Contractor Release of Claims requirements for JVs
Contractor renege on Confirmation of Negotiations
Contractor reproposing an already submitted proposal because of an updated FPRA
Contractor Request to add Clause provided by their Legal Department
Contractor Requesting GFE for a Contract
Contractor Requesting Government to Pay for Movement of Family Members
Contractor requests that we do not exercise options
Contractor responsibility
Contractor responsibility
Contractor resposibility to follow proposed solution
Contractor retains equipment after billing government for purchase price in performance of work
Contractor Security Requirements in Iraq
Contractor Signature Requirement for Small Purchase Orders
Contractor site surveillance when there is a SPA delegation in place
Contractor storing a large item
Contractor Support for Source Selection
Contractor Team Arrangements
Contractor Teaming arrangement
Contractor terminated reusing prior years funding
Contractor terms and conditions
Contractor threatens to suspend work
Contractor to pay for Governement Personnel Travels
Contractor tracking IT Hardware
Contractor Transferring Material for its own use
Contractor Travel
Contractor Travel that Crosses FYs
Contractor Travel within the Local Area and Cell Phone Costs
Contractor unable to fill positions
Contractor under an already awarded contract reaching to andother Govt/Army Agency for Laboratory Support
Contractor under investigation by DOJ
Contractor use of DD1149
Contractor Use of Govt. Automated System
Contractor utilizing a staffing firm
Contractor with two Different Contracts
Contractor working at Risk
Contractor/ Government workspace seperation
Contractor/Government Rental Car
Contractor/Supplies
Contractor-Acquired Software License
Contractors bank info
Contractors counseling GS and Active Duty personnel
Contractors Financial Arrangement with Private Lender
Contractors in Government facilities without Government supervision
Contractors inspecting government work
Contractors invoicing G & A to CR Traavel Line item on a FFP contract
Contractors involved with budget planning
Contractors Labor being Paid When They Travel
Contractors Property Database
Contractors Release of Claim omits 6 yr limitation clause
Contractors Release of Claims
Contractors using inproper type of Invoice/Voucher
Contractors working during government down days with no oversight
Contractor-to-Contractor Property Transfer
Contracts addressing Overtime
CONTRACTS AT OR BELOW THE MICRO-PURCHASE LIMIT
Contracts at the micropurchase threshold
Contracts Crossing Fiscal Years - OMA Funding
Contracts Dispute Act
Contracts Exceeding One Year
Contracts Exceeding One Year
Contracts for Local Telephone Exchange Services
Contracts for subscriptions
Contracts in Which Quantities Can Only Be Determined After Inspection by the OEM
Contractual Flowdown of FAR from Prime Contractor to
Contractual Remedies for Nonconformance of Supplies
Contractual Transfer of Government Property
Contractually possible - but still appears out of scope
Conultants
Convenience Check Use
CONVENTIONAL ORDNANCE DEFICIENCY REPORT
Conversion chart
Conversion of Cost Reimbursement to Fixed Price
Convert to present value
Converting a cost reimburseable contract to fixed price
Converting a Subcontract from FFP to CPFF
Converting a T and M Service contract to a CPFF contract
Converting a Trainer into a Weapon System
Converting hours to dollars under CPFF
Converting or transferring DHS COR certification to DoD
Converting Other Transaction Awards to FAR Based Contracts
Cookies - Juice
Cooperative Agreement and Grant Authority
Cooperative Agreement Task Orders
Copier BPA contracting during expired BPA
Copier lease with maintenance - Is it a service or supply
Copyrighted Data
Copyrights
COR
COR
COR - Acquisition coded positions.
COR and disposition
COR and Letter of Reference
COR and PM responsibilities
COR and PM Roles
COR and QASP Current Philosophy and Curric
COR appointing an asistant
COR Appointment
COR Appointment Authority
COR Appointment Letters
COR appointments/designation
COR Approval Authority
COR as Trusted Agent TA
COR Assignment
COR Assignment
COR Assignment Thresholds
COR Authorities
COR Authority
COR Authority to Request a Formal Proposal from a Vendor
COR Certification
COR Certification
COR Certification
COR Certification requirements
COR Clearance Level
COR CONUS travel approval authority
COR Credentials
COR demanding contract company fire a contractor for not performing out-of-scope work
COR Designation
COR doing inappropriate actions
COR duties
COR duties
COR Duties if Administration is Delegated to DCMA
COR equivalent courses
COR Exempt Contracts and Oversight
COR Exemptions
COR Lifetime Ban
COR Monthly Status Reports
COR need for A-E contract
COR need for A-E contract
COR needed on Individual Task Orders
COR needed?
COR On-Line Training Courses
COR performance standards
COR QAE inspection guidance
COR related duities in Wide Area Work Flow WAWF
COR Requirements
COR Responsibilities
COR Responsibilities
COR Responsibilities
COR Responsibilities Conflict between CLC 222 and An Ask the Professor answer
COR responsibilities for accepting supplies/services
COR responsibilities regarding cybersecurity in contracts
COR Security Monitoring
COR Supervisor and COR Position Descriptions
COR Surveillance requirements outside DOD
COR Surviellance/Contracting Officer and COR Checklist
COR Training
COR Training
COR Training - Cure Notice
COR Training and COR Training Equivalency
COR Training CLC222 Module data
COR training requirement for a Dawia Level 3 Contracting certified former Contracting Officer
COR training requirements for DCMA
COR vs OO
COR VS QAS?
COR, COTR, or GTM Delegation Requirement fo Contract Oversight
COR, Does the assignment have to be voluntary
COR/Director conflict of Interest
Core by Contractor and 50/50 Rule
Core Depot Assessment
Core Logistics Analysis (CLA) requirement for non-MDAPs
Core Logistics Capability
Core Logistics Determination/Core Logistics and Sustaining Workloads Estimate
Corporate Headquarters registration sufficient also for subordinate facilities FAR 52.222-24.
Corporation funding of a military integration project
CORR
Correct a deficiency that is life-threatening, health-threatening, or safety-threatening
Correct Appropriation for Civilian Salaries
Correct appropriation for Equipment installation
Correct Appropriation prior/post OT
Correct appropriation to purchase or build a model of a production vehicle
Correct appropriation to use when funding Information Assurance within a program
Correct contract vehicle
Correct PII number for GSA Buys
Correcting an improperly billed TO
Correcting LoA in SPS/PD2
Correcting Weapons System Impact tool data base
Correction to Option CLINS that were not marked Option in the contract writing system
Corrective action
Corrective Action Request (CAR)
Correctly identifying -no quote- responses
CORs and Invoices
CORS and OPSEC
CORs in the absence
CORs Performing Other CORs Functions Without Delegation Letter
CORs vs QAEs
CORT Tool compliant with DoD 5015.2
Cost
Cost Accounting Practice Change - Chages to DL Bid Codes
Cost accounting standards cost impact calculation
Cost Accounting Standards for the timing of incurrec cost and obligations on a CPFF contract
Cost Accounting Standards triggered by contract that includes commercial items and cost type CLINs?
Cost allowability of research into bid protests
Cost Analysis
Cost Analysis
Cost and Pricing Data
Cost and Pricing data labor rates
Cost and Pricing Data Requirements without a US Govt Contract Number
Cost and Schedule Impact Proposal
Cost and Software Data Reporting requirement for a PARM
Cost benefit analysis of contracting approaches
Cost CLIN
Cost CLIN on Purchase Orders
Cost Contract Ceiling
Cost Effective Admin/De-Ob
Cost Estimate
Cost Estimate Versus Proposal
Cost Estimating
Cost Estimating Relationships Recommendation
Cost evaluation in placement of MAC IDIQs
Cost for a modification in reference to minor nonconformance FAR 46.407
Cost for Test or Reportable Supply
Cost Growth
Cost Growth on a CPIF Contract
Cost Matching Funds on a contract not recommended for CPFF
Cost Modeling
Cost Modeling
Cost of acquiring Technical Data that was previously developed on a different DoD contract
Cost of commercial air fare after the fact
Cost of purchasing the TDP
Cost or Pricing Data
Cost or pricing data from sub contractors.
Cost Overrun and Award Fee
Cost Overrun Proposal
Cost Overruns in Depot Maintenance
Cost plus a percent of cost transaction
Cost Plus Award Fee contracting
Cost Plus Fixed Fee
Cost Plus Fixed Fee
Cost Plus Fixed Fee Contract
Cost Plus Fixed Fee contract and use of a clause
Cost Plus Fixed Fee in SAP Navy ERP
Cost Plus Fixed Fee WGL Negotiation Range
Cost Plus Incentive Fee
Cost Plus Incentive Fee (CPIF) Contract Fee determination
Cost Plus Incentive Fee Budgeting Year
Cost Plus Incentive Fee contract template, example, or clauses
Cost Plus Incentive Fee how to bill for the incentive fee
Cost Plus Incentive Fee Invoicing for Cost Incentive Fee Prior to Contract Completion
Cost Plus percentage of cost
Cost Plus Percentage of Cost?
Cost Proposal Analysis using a Sampling Approach
Cost Realism
Cost Realism
Cost Realism
Cost Realism - Subcontractors Who Propose Burdened Labor Rates
Cost Realism Analysis
Cost Realism analysis
Cost Realism for CPFF: Do we adjust the fixed fee element?
Cost Realism Interpretation
COST REDUCTION INITIATIVES - CLAUSE
Cost Reimbursable
Cost Reimbursable Holiday Allowable Cost
Cost Reimbursable CLIN on a LH Task Order
Cost Reimbursable CLIN with a FIXED Handling Rate
Cost Reimbursable Contracts require written Acquistion Plan
Cost Reimbursement Contract for Commercial Services
Cost Reimbursement Contracts
Cost Reimbursement Contracts with Foreign Vendors
Cost Reimbursement No Fee (CRNF)
Cost Reimbursement ownership
Cost reimbursement prior to Final Target Price on Fixed-Price Incentive Contract
Cost Reimbursible Travel CLIN on FFP Contract
Cost Reimbusable Contract Risk Assessment
Cost Reporting
Cost Reports C/SSR
Cost Risks with CLS
Cost savings of full and open competition versus sole-source
Cost Schedule Index
Cost Share FFP Title to Property
Cost Sharing and Fixed Price Contracts
Cost to fully execute a modification
Cost to Prepare a Cost Estimate
Cost to Rehab/Dispose of Property
Cost to repair items
Cost Transfer of Excess Contractor Acquired Material
Cost Transfer RDTE funds to OMA
Cost Voucher vs. Invoice
Cost Vouchers and Receiving Reports
Cost, Schedule, Performance, and Risk
COST/PRICE ANALYSIS-COST REALISM
Cost/Price evaluation criteria for Multiple Award IDIQ basic contract
Costing Software for FMS
Cost-per-Test Laboratory BPAs
Cost-Plus or T and M
Cost-Plus-Incentive-Fee Vs. Cost-Plus-Award-Fee
Cost-reimbursable contracts
Cost-Sharing
Co-Term Approach/ Bona Fide Needs Rule
COTR as a Source Selection Team Member
COTR for Federal Supply Schedule
COTR requirements
COTS Acquisition and Logistics Metrics
COTS IT Purchase Using 3080
COTS Shipping, Packaging and Handling
COTS Software Purchases
COTS/Altered COTS in a higher level assembly
Could an early ship clause be considered Christian Doctrine?
Could scope of a construction contract be considered differently than scope of a commodity contract?
Counter Narcotic Funds
Counterfeit parts
Counterintelligence Support Plan
COURSE CANCELLATION FEES
course video does not work
Co-use of Government Property
Cover letters for CDRL deliverables
Coverage Dates Issue After Previous Year Contract Expires
CPAF vs CPFF
CPARS
CPARS
CPARS - optional CPARS Report
CPARs and BAAs
CPARS and Grants
CPARS Registration
CPARS Requirement When Sub is not Performing and is a Government Entity
CPD Addendum template
CPD and CDD relations
CPD Ownership Cost KSA
CPD Question
CPFF - Payment of Prior-Yr. Fees
CPFF and 52.217-8
CPFF and CPAF
CPFF and FFP task order under same IDIQ
CPFF and Wage Determination
CPFF Being Used Incorrectly
CPFF Billing
CPFF Cancelling Funds De-obligation MODs
CPFF CLIN Use for FMS
CPFF Completion VS Term
CPFF contract- fee on unused ceiling
CPFF contract period of performance
CPFF Contract Question on Payment of Fixed Fee
CPFF Contract Type: Increasing the Cost and Adding Additional Funds to a CLIN
CPFF Contract, G & A Rate Adjustment and Cost Overrun
CPFF Fee adjustment on significant underrun
CPFF IDIQ Task/Delivery Order Property
CPFF Invoice Level of Detail
CPFF Labor Categories and Associated Rate
CPFF Labor Hour Invoicing
CPFF Labor Rate Ceilings
CPFF LOE contract and Fixed Fee
CPFF LOE Estimated vs CPFF LOE Provided
CPFF LOE Mod Authority
CPFF LOE Term synopsis question.
CPFF Modification Price Analysis
CPFF NTE evaluation in a LPTA type contract
CPFF Prime Contractor Issue
CPFF Profit Objective
CPFF Question
CPFF Requirement for DCAA review of invoices
CPFF Term Fixed Fee Adjustment
CPFF vs. FFP-LOE vs. T and M
CPI
CPI Determination and Criticality Analysis
CPIF
CPIF
CPIF - Negative Fee
CPIF and FPIF CLIN Values
CPIF CLIN on contract with little to no funding against CLIN for two years
CPIF contract
CPIF contract
CPIF contracts and Ceiling Price
CPIF Contracts and Estimated Costs
CPIF cost cap
CPIF Final Incentive Fee Calculations
CPIF or FPIF implementation on Ordering Contract
CPIF Proposed Target Fee = Maximum Fee
CPIF Type contracts
CPSR
CPSR and Hybrid Contracts
CRA question
CRA- What exactly does prohibit the increase in production rates above those sustained with FY16 funding mean
Creating a CPFF subcontract
Creating an Acquisition Strategy and a Acquisition Plan
Creating DD250s for Contracts
Creation of Contract Files
Credit applications
CREDIT CARD PURCHASE FOR MAINTENANCE ON MEDICAL EQUIPMENT SERVICE
Credit for a returnable item
Credit for Lower Tier Small Business Subcontracting
Credit for Recycling
Credit or Refund for Service Not Delivered
Credit proposal
Critical Chain Scheduling vs. Critical Path
Critical Design Review (CDR) - Valid Performance Based Payment (PBP) Event?
Critical Item Management
Critical Path Length Index (CLPI)
Cross utilization of GP specifically ST.
Cross-Service Acquisition Documentation Re-Use/Reciprocity
CRP for a GOCO facility
CRR Post Award Orientation Recommendation as it applies to property administration
CSB vs. AFRB
Cure Notice
Cure Notice
Cure Notice
Cure Notice
Cure Notice Repository to look up Cure Notices
Currency exchange is causing contractor to lose money
Currency Rate Change
Current DOD WBS Manual
Current funding future requirement
Current Information Source For NSNs, Pricing, Vendors, Vendor CAGE Codes, etc.
Current revision of Form DD1387 Vendor Shipment Module
Current Ruling on Cloising IDIQ Task Orders and the Ability to Adjust Funds on CLINs
Current status of DPG (vs. JPG)
Current TEMP Guide
Current vs. Exprired Appropriation for Canceled Fund Obligation Adjustment
Current Year Execution
Curriculum and Pilot Program for New Technology
Customer Follow Up Regulation
Customer help with Independent Government Estimates IGEs
Customer Interaction w/Vendor
Customer Owned Property on Warehousing Task Orders
Customer Problem
Customer/Owner comments and effect change
Customers Quotes
CVE Certification Status Change
CWBS Considerations
Cyber Incident Cost Allowability
CYBER LAW Class or CBT
Cybersecurity guidelines for software developers of non-IT systems
Cybersecurity SOO language
Cybersecurity Strategy
Cybersecurity Strategy template format
Cycle times for 1st phase of acquisition
D and F for Property - Sample
D& F Commerciallity
D&F - Cost CLIN
DA Form 1687 Digitial Signatures
DA Pam 700-28 - checklist on page 24
DAB Documentation Stakeholders
DAB vs. DAB IPR
DACO Assignment Question
DACO v. ACO Authorization
DAG vs. 5000.02
DAL - How to get a document
Damage to Government Property
Damaged deliverable items and collection of proceeds from contractor
Damaged government equipment held at a contractors facility
Damaged Government Property Relieved of accountability and use for training and process improvement
Danager Pay
Danger Pay, Arduous or Harmful Work, and Overtime Rates on FMS contracts in Iraq.
DARS 52.204-9001 Contract-Order Closeout Fixed Price, Time and Material and Labor Hrs
DAS or DAMS?
DASA Requirement on ACAT III programs
DASD SE PQM Roles
Data Accession List (DAL) content
Data Accession List CDRL
Data Accession List DAL lessons learned
Data Collection and Analysis
Data Interchange Requirements
Data Item Description
Data Rights
Data Rights
Data Rights
data rights
Data Rights at the end of contract when the contract contained no clauses and was silent.
Data Rights Clauses
Data Rights FAR 27
Data Rights Government Purposes
Date of Determination
Date of Determination in a Standard Operating Procedure
Date when size is determined for subcontractors?
DAU Assist
DAU Calculator or escalation tool
DAU Clause Matrix
DAU CLC 011 Contracting for the Rest of us
DAU Decision Brief Template Power Point Format
DAU funding
DAU LC Chart
DAU MDID Tool
DAU SAM QASP Template -- Mandatory, or Intended as a Guide?
DAU-Government Property Manual Suggested Guidelines
DAUs Units of Measure table
Davis Bacon and company owners
Davis Bacon applicable to some services
Davis Bacon Wage Rates
Davis Bacon Wages
Davis/Bacon Wage Rates
DAVIS-BACON WAGE DETERMINATION
DAWIA 1102 Qualification Standards
DAWIA Certification and Core Plus Development
Days to settle a claim and days interest accrues
D-B Wage Determination Update
DBA Insurance in Africa
DBA Wage Rates
DCAA Accounting System approval Duration
DCMA Plant Clearance Shipments to DLA DRMS. What type of disposition is it?
DCMA Counterfeit Electronic Parts Checklist
DCMA PCARSS updating IUID Registry
DCMA Quick Closeout Class Deviation
DCMA Source Inspection without DCMA Admin in block 6?
DCMA Support
DD 1149 as the only Proof of Government Property
DD 1149 Form
DD 1423 codes
DD 2345
DD 250 Material Inspection Receiving Report
DD 250 or 1149 or nothing.
DD 254
DD 254
DD 254 for MIPR
DD 2579
DD 2579 and Utility Services
DD Form 1423-- Data Managers
DD Form 1423, CDRL Blocks 7 and 8
DD FORM 1574/1574-1
DD Form 1576-1 Blue Tag clarification
DD Form 1594 in EDA
DD FORM 2275
DD Form 2566 instructions
DD Form 2579 - When Required
DD Form 2772
DD Form 882 and FAR 12 Contracts
DD1149 Instructions
DD1149 vs IUID Registry
DD-1391
DD1494 vs. SSRA
DD1547 form
DD1586 Contract Funds Status Report
DD250 Amendment or Correction?
DD250 delay entry into WAWF
DD250 for Consumables?
DD250 for LOE SLINS
DD250 Material Receiving Report
DD250 of Services
DD-250 Sign Off for Title 10 CORE Requirements
DD254
DD254
DD254
DD254 Required?
DD2579 and IDIQs
DD2579 and Option to Extend Services
DD2579 instructions, form not applicable to IDIQ orders
DD2579 required for modifications to MILCON projects?
DD448 MIPR Instructions
DD882 Signature Requirement
De Scope
DE-0301 and PQM Career Field?
Debrief dollar limit
Debriefing after cancellation of solicitation
Debriefing for Awards under FAR Part 13
Debriefing for Awards under FAR Pt 13
Debriefing Format Procedure for SAT
Debriefing unsuccessful offerors
Decentralized Schedule
Deciding what goes on the Modification Table of Equipment MTOE or Table of Equipment vs the Common Table of Allowances CTA
Decision Authority
Decision Authority for Fair Opportunity Orders
Decision flow charts
Decision Review Process for Systems Retained following QRC Deployment
Declaration of DRs and WITS?
Declassifying GFP so a contractor can use the asset on a direct commercial sale with a subcontractor and RSAF
Decorative Carpets
Decrease of Surety Bond after Contract Award
Decreased scope contract extension
Decreasing CPFF CLINs Unit Price
Deducting funds from one task order to reimburse government for demand on another
Deducting minimum guarantee when no task order was awarded
Deemed follow-on contract
Def Business System Information
Default Clause vs. Changes Clause
Defective cost or pricing data
Defective Pricing Principle and Interest repayment
Defender 2000 Repair
Defense Acquisition Guidebook - Content of Acquisition Strategies
Defense Acquisition Reform
Defense Acquisition System
Defense Base Act / Workers Compensation Insurance - Overseas
Defense Business Systems
Defense Business Systems Management Committee
Defense Commercial Solution Opening (CD 2018-O0016)
Defense Contingency COR Handbook
Defense Health Program
Defense Information Infrastructure Common Operating Equipment compliant
Defense Priorities and Allocations System applicability
Defense Working Capital Fund Process Map
Deferred compensation
Deficiency Report trend data indicating potential systemic causes best practices
Define LTDD and Mishap
Define -- Warrant
Define "Pilot" and "Prototype"
Define differences between a Regulatory and a Statutory Requirements
Define how Single-award contract is used in the DPAP letter dated 14 Sep 2010
Define Notional Quantity
Define Rough Order of Magnitude ROM
Define the term Periodically
Define unique-item identifier or equivalent
Define, list key elments, differences, between LCSM and ICP
Define, more of the same, in regards to options
Defining Flyaway costs as it pertains to Aircraft Mods
Defining How to Report the FYDP
Defining out of Scope requirements with respect to dollar value
Definition
Definition
Definition of CHINFO
Definition and differences between mission funding and working capitol funding
Definition and intent of a no cost extension
Definition and Source of the terms Statutory and Regulatory
Definition for Data Required for Production Level Drawings
Definition of "Requesting a Contract Modification"
Definition of a major contract value
Definition of a national buy
Definition of a Requirement
Definition of a UFR
Definition of Adequate as it applies to a contractors business system
Definition of Affordability
Definition of business day and calendar day
Definition of Cancelling Funds
Definition of Centrally Managed/Asset Controlled Item for Expense/Investment Cost Determination
Definition of Classified Material
Definition of complete repair
Definition of Contractor Support Services
Definition of Depot Maintenance
Definition of Fair Opportunity
Definition of FDD and FOC
Definition of Installation within the term OMIT
Definition of Leases as service contracts
Definition of Level Above Contracting Officer
Definition of Limitation
Definition of Manageability and Versatility
Definition of manufacturing
Definition of manufacturing cost
definition of modification type
Definition of MOT-E
Definition of MSD and NSD and where they can be located.
Definition of Nominal Quantity in Awarding IDIQ Contracts
Definition of Obsolete Part
Definition of of Document Type
Definition of Period of Performance
Definition of Policy, Plans, Prodedures
Definition of Previous Requirement
Definition of Prime, Tier 1 and Tier 2 Suppliers
Definition of Public Release
Definition of Regular Dealer regarding Walsh-Healey
Definition of Research and Development
Definition of services
Definition of Sole Source and Single Source
Definition of Source
Definition of Tailored Training for SF 182 Use
Definition of the difference between Point of Total Assumption and Ceiling Price
Definition of the term flaw as it relates to proposal response
Definition of the term Trusted Agent
Definition of Tier X
Definitions
Definitions
Definitions and Duties
Definitions of Legal Contract Terms and When to Use Them
Definitive contract was set up instead of an IDIQ contract
Definitized contracts
Defintion of Month
Delegating Validation Authority for MDAPs
Delegation of Authority for MIPR Acceptance
Delegation of Authority from GSA to DOD for personal property disposal
Delegation of CIO CCA Confirmation
Delegation to DCMA
Delegations of Authority
Deleting terms and conditions from FAR 52.212-4
Deletion of Work
Deletion of Work
De-linking of A131- 7.62 ball with tracer linked
Delinquent Federal Debt
Delinquent Obligation Prevention Training/Checklist etc
Delinquent Obligation Resolution
Delinquent Orders between 196-1089 days and PCO still states requirement is needed.
Deliverable for SDFs
Deliveries to residential addresses
Delivery exceeds 12 months
Delivery extensions
Delivery of Excess Quantities
Delivery Order - GSA Contract
Delivery Order Awards
Delivery order CLIN structure
Delivery Order Expiration Date
Delivery Order on IDIQ
Delivery Order/Task Order Modifications
Delivery order/task order signed by the contractor
Delivery Schedule Verification - DAC
Demand Forecasting Model
Demil and Disposal Program Manager
Demil Plans and Disposal Plans
Demilitarization Plan
DEMOLITION CONTRACT ENTIRELY CONSIDERED AS A SERVICE
Demolition contract under FAR Part 37.3
Demonstration Agreement
Demonstration purchase using a purchase card
DEOB excess funds
Deoblgiation of Funds
Deobligate Funding on Protested Service Contract
Deobligate FY08 Funds and Reobligate with FY13 Funds
De-Obligating canceled funds during contract closeout
De-obligating Cancelled Appropriations
De-obligating Current FY Funding Before EOFY
De-obligating excess funds on a FFP Commercial contract after completion of performance
Deobligating excess funds on contracts for closeout.
Deobligating Fund on a Firm Fixed Price Service Contract
Deobligating Funds
De-obligating funds
Deobligating Funds against canceled appropriations
Deobligating funds from contract
Deobligating Funds on a Commercial Contract
Deobligating money
Deobligating Procurement Funds
Deobligating Unilaterally
Deobligation authority for IDIQ non-commercial personal services Contracts
De-Obligation Document
Deobligation Miniumum Amount
De-obligation modifications
De-obligation Modifications
Deobligation of Canceling Funds - Can the PCO unilaterally de-obligate?
Deobligation of Cancelling Funds - effect on Contract Price
Deobligation of DOD Dollars
De-obligation of Funding on CPFF contract
Deobligation of Funds
De-Obligation of Funds
Deobligation of Funds - impact to Contract Value
De-obligation of funds and contract file retention
Deobligation of funds from an ongoing RDTE CPFF contract
Deobligation of Prompt Payment Discount Monies
De-obligation PR
Deobligations
De-obligations and Refusal to Notify of Final Invoice
Deobligations and reobligations
Deobligations of excess funds from previous years on contract.
Department of Defense Address Code DODAC Use By Multiple Units
Department of the Navy System Acquisition Review Council
Dependent tuition for contractor on overseas deployment
Depot Activation
Depot Certification
Depot Level Reparables
Depot Level Support
Depot Maintenance Support Plan
Depot source of repair DSOR
Depot Stand-up
Depot Stand-up Capabilities Funding
Depreciation Expense - ownership of the asset
Depreciation Expense - ownership of the asset-
Dept of Defense Acquisition Workforce Development Fund -DAWDF
Derived Requirements
Descope
De-Scope and De-Obligating a Purchase Order
De-Scope or moving items off a contract
Descope the amount of an services contract option award
Descope to work performed
DeScope vis partial Termination for Convenience of the Government
Descoping a Contract.
Descoping an awarded construction contract to fund required design changes
De-scoping and how it affects funding ceiling
Descoping Awarded Options
Descoping in prior contract years
Descoping proposals
Descoping the contract and its implication on Fixed Fee
Description of Contract Types
Design Build
Design Build for Maintenance and Repair O-M funds
Design build proceeds without notice to proceed
Design Build Subcontractors
Design Build vs Design Bid Build
Design Cost for Minor Construction Projects
Design of Experiments
Designated Overhaul Point -rework facility
Designating a Competition Advocate
Designation as an IT Program of REcord
Design-Bid-Build as Two Phase
Design-build
Design-build contracting
Designer of Record
Desperately in need of DoD Supply System Training
Detailed drawings.
Details for Developing the Logistics Requirements and Funding Summary (LRFS)
Detemining contract ceiling for multiple contract types
Determe the hardware limitations associated w/ IS-CDD
Determination and Finding Single-Source Award of IDIQ
Determination and Findings
Determination and Findings
Determination and Findings
Determination and Findings for Contract Type
Determination and Findings for Performance Based Incentive
Determination and Findings for using other than sealed bidding
Determination and Findings needed for issuing GFP
Determination if clause is mandatory
Determination of allowability under DFARS 231.205-18
Determination of Best Procurement Approach Direct Acquisition D&F
Determination of Best Procurement Approach Format
Determination of Non-Personal Service
Determination of Price Fair and Reasonable of Services on Ability One Procurement List
Determination of Responsibility
Determination of Responsibility
Determination of sole source after receipt of bid
Determing ACAT IV / AAP designation for an IT Program
Determing Fair and Reasonable Salaries
Determining a Service vs. Supply
Determining ACAT level
Determining allowable costs on CPAF contract
Determining Applicability of Negotiated Acquisition Definition to FAR 13.5
Determining CAS Coverage
Determining clearance authority
Determining Commerciality
Determining Conflicts of Interest
Determining Contractor Responsibility, Bankruptcy Proceedings
Determining COR qualifications
Determining CORE for Sub-systems
Determining Correct Treasury Rate On DD 1861 for Multiple Periods
Determining CPD threshold for a single proposal that includes commercial and non-commercial items
Determining Inventory Objective
Determining Labor Rates Fair and Reasonable
Determining Level of Effort - LOE
Determining Price Reasonableness on Sole Source Acquisitions
Determining profit on Time and Material wrap rates?
Determining reasonable O/HG and A and Profit Rates
Determining the appropriate funds to use
Determining the Need for a Subcontracting Plan
Determining Thresholds on IDIQ contracts
Determining value to use in VATEP
Determining When a Program is Officially in the Operations and Support Phase
Developing a Maintenance Allocation Chart and the TM Functional Group Codes
Developing CLINS on PRC
Developing Programmatic Strategy System Level
Development and Production Contract Strategy
Development Cost
Development Engineering Funding for ANG/AFRC Programs
Development of a Contractor ROM
Development of a Software Program
Development of a Unique Option Clause
Development of Programs Outside of the Acqusition Process
Development RFP Decision Point
Development RFP Release Cost Assessment
Developmental test and eval requirements
Deviation from the FAR for Utility Contracts
Deviation to Clause 52.212-5
Deviations for Labor Mix ordered on Time and Materials Basis
DFAR 245-105 Revised Nov 18, 2011
DFAR 252.225-7001 Buy American
DFAR 252.225-7016
DFAR 252.226-7001 applicability overseas
DFAR 252.227-7027, Deferred Ordering
DFAR 252.234-7002 EVMS
DFAR 252.245-7005 Contractor Business System
DFAR Application/Technical Data Marking
DFAR Clause 252.227-7030 Technical Data Withholdings of Payment
DFAR Contractor Business System Clause versus DFAR contractor Purchasing System Clause
DFAR, Special Tooling, Nonmodified COTs components from McMaster-Carr
DFARS 204.7103 1 4 Single accounting classification citation
DFARs 206.302-1
DFARS 208.602-70 question
DFARS 216.405-2
DFARS 225.7009-5 Interpretation
DFARS 225.7300 application
DFARS 237.72 Educational Service Agreements
DFARS 242.302
DFARS 252 204 7000 Disclosure of Information AUG 2013 Require Approval for Audit Requests
DFARS 252.209-7999
DFARS 252.211-7003
DFARS 252.211-7003 ITEM IDENTIFICATION AND VALUATION
DFARS 252.217-7012 and Contractor Liablity for Damaged GP
DFARS 252.225-7008
DFARS 252.232-7007
DFARS 252.242-7004 MMAS applicability
DFARS 252.242-7005 C/SSR
DFARS 252.245-7004, Reporting, Reutilization, and Disposal, Aug 2011
DFARS 252.246-7007 vs SAE-AS5553
DFARS and NASA
DFARS Class Deviation 252.209-7999
DFARS Clause 235.006
DFARS Clause 252.212-7001
DFARS Clause 252.228-7002
DFARS Clause 252.232-7007
DFARs Clause or Contract Mod, Who Wins?
DFARS Clauses - Full Text vs In By Reference
DFARS Clauses and Provisions
DFARS Clauses Incorporated by Reference
DFARs for Commercial Item Flowdown
DFARS Implemental Numbering
DFARS PGI 204.7103-2c, Do Task Order CLINS have to match the Basic Contract?
DFARS PGI 245.103-72
DFARS Proposal Adequacy Checklist
DFARS to FAR conversion
DFAS and contract closeout
DIACAP phases in the Acquisition phases
DIB Population
DID for contract data requirement form to support system integraion and test and evaluation
DID Guidance
DIDs and the contract
DIDs for System Security Docs
Difference between a determination and determination and findings
Difference between a MOA and a SOW
Difference between a service contract and a commodities contract
Difference between ACQ O and M and O and S Costs
Difference Between Acquisition and Procurement
Difference between attachments and exhibits in Section J?
Difference Between Basic Agreement and Basic Ordering Agreement
Difference Between Clarification and Discussions
Difference between EMD configuration and LRIP configuration?
Difference between FAR Part 12 - Commerical Pricing vs FAR Part 15 - Military
Difference between IDIQ and BOA
Difference between Incentive and Constraint
Difference between JCTD Eval of Alternative and AoA post ICD
Difference between MRA and PRR
Difference between PDR and CDR
Difference between PRIME SUBCONTRACT relationship and TEAMING AGREEMENT
Difference between profit and fee
Difference Between Property under Control of Contactor and GFE
Difference between RFQ and RFP
Difference between the definitions ofMaterial Availability and Operational Availability
Difference between Total Estimated Cost, Contract Value, Contract Funding Amount
Difference between verify and justify
Difference in Profit between Low and High Salaries for a Specific Labor Catogory and Rate
DIFFERENCE in SIZE CERTIFICATIONS
Differences between CDRLs and Deliverables
Differences between Oct 2012 and May 2015 versions of the MRL Deskbook.
Differences between Product Support Integrator (PSI) and In Service Engneering Agency ( ISEA)
Differences in format
Different Buying Activity
Different contract type for subcontractor
Different FY Funding for Equipment Purchase and Installation
Different Periods of Perfomance per CLIN
Different product vs upgrade of same product
Different Types of Money on the Same CLIN
Differentiate between SETA and CAAS
Differing site conditions - Can you solicit a proposal before receiving certified funds
Difficulity getting a vendor to sign a contract that has been awarded
DI-ILSS-80118C
DI-ILSS-80293 REPLACEMENT
DI-MGMT-80004A
Diminishing Manufacturing Sources clauses
Diminishing returns in systems engineering
Direct Acquisition under the Economy Act
Direct Acquisition versus assisted acquisition
Direct award for SDVOSB using the GSA schedule
Direct Change - FFP contract
Direct Contract Closeout Costs
Direct Labor Rate Analysis
Direct or Indirect Costs for rental space
Direct Purchase of Class 7 managed equipment
Directed Change SOW
Directed Requirement Guidance
Directed source extensions
Directed Subcontracting with 8a Small Businesses
Directing a contractor
Directing a Prime
Directing Contractor Employees
DIRECTION FOR CONPLETION OF FORM 2579 BSED ON SCENARIO
Direction to Sub-contractor
Director of Business Operations
Disabled Veteran owned Small Bus Business Direct Award
Disbursement against funds.
Disclosing potential requirements information to a single contractor
Disclosure of Information DFARS252.204-7000
Disclosure of the Magnitude of Construction Projects -- strict ranges?
Disclosure Statement
Discounts on Material for Construction Contracts
Discrepancy between FAR Part 5 Exceptions to Synopsizing and FAR Part 19
Discrepant Contract Acquired Material
Discretionary Set-Asides under GSA Schedules: BAA or Trade Agreements?
Discussion groups about provisioning
Discussions - Pre Negotiation Position?
Discussions - Required to Revise Small Business Goals?
Discussions during the LPTA process
Discussions with LPTA
Discussions with MACC TOs
Discussions with Vendors
Dismantling, Demolition, or Removal of Improvements
Disposal of Aircraft Part
Disposal of GP accountable to 52.245-2 Clause
Disposal of purchase card files
Disposal Plan template
Disposal/Recycling of Excess Government Property
Disposing contractor's payroll form.
Disposition Field Required Data
Disposition of classifed DD-254 when it is tranferred to a follow-on contract
Disposition of contracts w/expired warranties
Disposition of excess GP to Foreign Country and Foreign Contractor
Disposition of Fuel Removed from Aircraft
Disposition of Government Provided Software
Disposition of intellectual property and software
Disposition of Items from Program to Program
Disposition of non-conforming material received from a contractor
Disposition Procedures for Property Aquired with ANSF Funds?
Disputes
Disqualification
Disqualifying Potential Offerors Prior to Issuing a Solicitation
Disregard - Testing Email Functionality
Disruption Claim (construction) - Non Compensable?
Distance as an evaluation factor
Distribution of Award Fee
Distribution Statement
Distribution Statement Updates
Divested increments and ACAT threshold
DLAD or PCARSS
DMWR REQUIREMENTS
Do 2013 NDAA changes supersede FAR 52.219-14
Do Ability One contracts remain Ability One as long as the requirement exists?
Do all businesses have general and administrative costs?
Do all contract line items require documented Acceptance
Do all Contractors need to be registered into the Total Workforce Management System
Do claims or settlement require a DD 250
DO CONSUMED ITEMS GET A RELIEF
Do Contract Awards off a Broad Agency Announcement Require POM and/or PNM?
Do COR requirements necessarily apply to demolition?
Do deployed MAIS Defense Business Systems -with no modernization requirements- have to meet with the IRB before obligating FY2012 funding?
Do Federal Holidays Count When Calculating Calendar Days for Posting Requirements?
DO GOVERNMENT ESTIMATES HAVE TO BE SIGNED BY THE PERSON WHO PREARED IT?
Do I have to have funding Committed for Base and Option Years?
Do I need a J&A?
Do I need a new POM for a Mod to add services to a Sole Source Contract
Do I Need a QASP....How Long Do I Need to Solicit?
Do I need a SOW/PWS for a Commercial Service/Maintenance Agreement
Do I need an Acquisition Plan for a contract off a BAA
Do I need an Operational Mode Summary/Mission Profile (OMS/MP) for a Common Table of Allowances (CTA) item?
Do I need both a QASP and a Contractor Quality Control Plan for Performance Based Contracts?
Do I need delegated authority for incidental services that are not delegated to my command?
Do I need to do a formal JA to increase the quantitity by 100 percent on a FSS task order?
Do I need to fill out a DD1597 if SAP were used over the SAT?
Do I need to get approval from the Milestone Decison Authority
Do I need to modify a FFP, multi-year services IDIQ every year to incorporate CBA adjustments?
Do I need to request certified cost or pricing data if for a Mod under Far 52.217-8
Do I need to send Preaward notices of exclusion from competitive range AND Preaward notices for small business programs?
Do I suspend, descope or terminate?
Do I use a DD250 to transfer back Government Prop or a 1149
Do MMAS Reviews Satisfy PMSA Requirements for Contractor Acquired Material?
Do modifications on an IDIQ count as part of the maximum?
Do Option Clauses flow down from the basic award to the TO
Do R & D 3600 funds have to be separated by different CLINs for 6.1 through 6.7 funding?
Do regulations permit contract payments without CLINs?
Do subcontracts require a PWS/SOO/SOW specific to the subcontract?
Do the Limitations in Far 6.302-5 apply to Source America?
Do the most highly qualified firms have to meet the solicitation requirements to satisfy Brooks Act?
Do thesholds automatically increase for contracts or subcontracts if dollar amounts are not specifically stated?
Do timesheets have to be signed for labor charges to be allowable?
Do we have to add clauses to GSA awards?
Do we have to DD250 the ST/STE on our contracts?
Do we need to add clauses on a purchase order for a ratification?
Do we require any special authorization to use the shipping company in the host country?
Do working meals served at hotels use the service contract act
Do you have a list of CAAS Codes
Do you have any information on what an A-CCD is or means?
Do you have to compete a single source BPA call, if the BPA itself was competed?
Do you have to include option clauses when writing a task order against an established BPA that includes option clauses?
Do you have to perform cost realism analysis of all proposals received
Do you have to respond to losing competitive vendor in SIM ACQ?
Do you have to utilize Peformance Based Payment or Progress Payment for an LRIP program
Do you know if an Acquisition Strategy Plan is required for a SBIR Phase III?
Do you need a payment bond for construction contracts less than 150K?
Do you need a small business dissolve when you have a brand name pseudo competition amongst small businesses?
Do you need to contact Business Administration Regional Office when terminating a debared Small business
Do you need to determine the price fair and reasonable for an IDIQ contract if not funded?
Do you obligate all money with a monthly unit of measure
Do you provide pricing when requesting a technical evaluation?
DO-178B MSO-C145 GPS Precise Precision System Equipment DOD aircraft certification
Doctor Appoint Fee
Document
DOCUMENT AUTHENTICATION
Document Precedence for Construction Contracts
Document reference
Document Rejection Procedures
Document Sponsor for post-ICD requriements documents
Document templates
Documentation for requirement of GFP
Documentation Needed When Employee of Contractor is on leave during
Documentation required for MS C , when coming from a JCTD
Documentation required to deliver CAP assets to Government
Documentation requirement under acquisition Model 3: Incrementally Fielded Software Intensive Program
Documentation requirements for simplified acquisitions
Documenting IA Certification Status for Contractors
Documenting Negotiation Range for a Cost Plus Fixed Fee Contract based on WGL recommended fee
Documenting the Confidence Level
Documenting The File At Award For Options According to FAR 17.205b
Documents Referencing Distribution D CDRLs
Documents required
DoD 1423 Block 1 and PGI 204.7105 Contract exhibits and attachments
DoD 3210.6-R Department of Defense Grant and Agreement Regulations. CXLed?
DoD 5000 guidance to support placement of milestone
DoD 5000 series
DoD acquisition policy flow
DoD Business Systems Domain Transition from Development to Sustainment
DoD Center of Excellence Business Model
DoD Charge Card Guidebook 21Dec2011
DoD CIO
DOD Civilian salary
DOD contract to local government
DOD contract to local government
DoD contracting timelines
DoD Contractor Labor Rate Inlfation Standard
DoD Contractor Signing For Army Property On A Hand Receipt
DoD COR certification standard Type C and Information Assurance
DoD definition of Special Inspection Equipment - SIE
DoD Dollar Thresholds for any acquisition, contracting, or facilities management
DoD Earned Value Management System
DOD Emall - Mandatory Sources
DoD ESI SAP Public Services, Inc. BPA, DHA Task Order
DoD exception to the use of 52.219-4?
DoD Guidance for Conducting Joint Military Utility Assessments
DoD guidance on ship acquisitions
DoD guidance/examples
DoD Instruction and COR Handbook
DOD IPS Implementation Roadmap: CDD
DoD Long Line of Accounting comparison between Departments/Agencies
DoD Memo Contract Type C and D
DoD MicroPurchase Threshold increased to 5,000?
DoD OPSEC Language for Contractors
DoD or Commercial Standards
DoD Organic Depots as PSIs
DOD policy on applicability of lower tier references in specifications and standards
DoD policy on physical seperation of DT and OT
DoD policy on Software Management policy
DoD Property Management and Responsabilities
DoD Small Businss Commitment Document
DoD Source Selection Data Set
DoD Source Selection Procedures
DOD SUP FAR 252.233-7001, Choice of Law Overseas
DoD Technology Transfer Agreement - TTA
DoD Verification Process Document
DoDAAC Question
DoDAF 2.0 viewpoint examples
DODAF 2.02
DODAF 2.02 Figure
DODAF model and Autonomic Logistics
DoDAF views Requred By JCIDS and Each Milestone Decision
DODD 5000.1 Replacement
DoDD 8500.1 and DoDD 8500.01E - differences?
DoDEA STEM INITIATIVE
DoDGARS Parts 32 and 33
DoDI 5000.02 dated 07 Jan 2015
DoDI 5000.02 dated 2013 and 2015
DoDI 5000.02 for software acquisition
DODI 5000.02 ILA Requirements
DoDI 5000.02 References
DODI 5000.02 REVISION
DoDI 5000.02: Model 5 - Hybrid Program A - Hardware Dominant
DoDI 5000.02: page 7-8 of the PDF document
DODI 5000.58.1 Defense Acquistion
DoDI 5000.74 Service Requirements Review Board
DoDI vs DoDM
Does $750K threshold apply if used prices from a supplier but will not go to that supplier for all the parts when buy?
Does 215.371-1 require the PCO to obtain a full certified proposal or just the parts not fair and reasonable
Does 52.244-2 apply to SBIR Phase III prime contracts?
Does 8a sole source authority apply for single award IDIQ contracts
Does a 1423 need to actually be signed for each individual CDRL?
Does a BPA have to be competed ?
Does a BPA have to be priced?
Does a BPA with an IGE above $25K need to be post on the GPE
Does a Certificate of Current Cost or Pricing Data require a Contractors Seal?
Does a CLIN overage create a UAC if there is still funding available on the contract?
Does a figure exist that shows the Cost and Time of an Average ACAT-1 Program on a Bell Curve
Does a formalized Contract awarded include all the solicitation FAR clauses?
Does a goverment representative have to approve use of Non-conforming material in all cases?
Does a JV need a separate DCAA approved cost accounting sytem?
Does a Name Change and Tax ID change require a Novation Agreement?
Does a non-bidder have standing to protest?
Does a non-conforming component need to be identified throughout the life cycle?
Does a program in Operations and Sustainment require an APB?
Does a ratifying official need to also have contracting authority for the commodity in order to ratify?
Does a single end item must be paid with one LOA
Does a single offer require an J and A
Does a sole source environment exist if a manufacturer will only sell to the Federal Government through one authorized reseller?
Does a SOW or PWS have to go out with a sources sought synopsis?
Does a subcontractor have to register with SAM.gov?
Does a substitute product qualify as a Value Engineering Change?
Does a UARC with 52-245-1 Alt II, retain title to under 5k CAP returned from a Sub
Does a warranty delay closeout?
Does ACAT determination apply to FMS case or contracts?
Does an approved SF-182, without an approved PO, negate an unauthorized commitment?
Does an IGCE need to be revised after receipt of proposals?
Does anyone have an agency policy or Directive on Contract Line Item Structures
Does Certified Cost and Pricing Data require audit?
Does Completion of ECPs also get granted the additional one year on Supply Contracts
Does consolidating two contracts with a total value under the SAT require a writtten determination?
DOES CONSTRUCTION FALL UNDER SUPPLY OR SERVICES?
Does DAU maintain a sample set of IBR documents such as WAD, RAM, CAP, etc?
Does Davis-Bacon Act applies to Puerto Rico.
Does dba name require a Change of Name agreement?
Does DFARS 215.304 apply to Part 12 procurements?
Does DoD have to establish an ACAT III Acquisition Program for a Development Effort managed by DoE in a joint effort?
Does DoD issue any contracts utilizing FAR Part 17.6
Does DPAS apply to commercial items?
Does every small business contractor require a facilities clearance
Does exercising -8 option require increasing total ceiling of Base IDIQ
Does FAR provide authority to transfer vehicles to contractors for commercial use, independently of AR 700-131?
Does FAR 13.501 apply to purchases under 150k
Does FAR 16.504 apply to contract extensions?
Does FAR 17.5 apply to all non-Economy Act agreements or only those resulting in a contract action by the requesting agency?
Does FAR 19.1406 apply to contractors?
Does FAR 45.106 apply only to existing contracts vs. new awards
Does FAR 52.208-9 Contractor Use of Mandatory Sources of Supply or Services Apply to Facility Support Service Contracts?
Does FAR 52.216-18 enable a PCO to change unit prices in prior existing delivery orders without having to issue individual modifications to the existing delivery orders?
Does FAR clause 52.215-2 offer impose a requirement for the Government Property Administrator to perform yearly surveillance in addition to the PMSA?
Does GFP Default to the Owning Contract
Does Government have to pay for renovation to contractor-leased spaces
Does issuing an RFP on a MILCON contract for a modification under the Changes Clause create or authorize an obligation under FAR 32.702?
Does Limited Site Access Constitute a Non-Severable Service
DOES NAF CONTRACTING NEED FAR? IF SO, HOW BROAD IS FAR APPLICATION IN NAF CONTRACTING?
Does PGI 215-404.2c apply to DCAA for non-DoD contractor proposals?
Does Profit Have to Be Submitted to Prime Contractor
Does SAT include $250,000
Does scope or color of money dictate the Cost plus Fixed Fee ceiling?
Does Service Contract Act apply to delivery of Commercial Limestone Rock?
Does Service Contract Require DD250 When FARS and DFARS are not cited in the contract.
Does Soliciting new priced BPA on GPE satisfy future calls FAR 5.201 and FAR 13.303-5c
Does sustainment start after a Depot Maintenance Activation Working Group?
Does the 3000.00 GPC limit apply to GSA Global Supply
Does the 500 dollar administrative cost for multiple awards only apply to sealed bidding?
Does the 5000.75 series actually replace/superdede the 5000.02 series?
Does the 6 percent fee limitation apply to the design portion on a design build construction contract?
Does the 6 percent Limitation apply to multiple AE designs for the same requirement?
Does the Acquisition Strategy Paner ( ASP) Chair have to be Acquisition Professional Development Program (APDP) P certified? And if so, what level?
Does the APUC include all procurement costs or only procurement funded costs
Does the Berry Amendment apply to components for a parachute system?
Does the Berry Amendment apply to rental of linens?
Does the bona fide need rule apply to maintenance of already purchased software licenses?
Does the bona fide need rule apply to the purchase perpetual software licenses?
Does the Business System rule negate the PAs authority to perform the PMS Risk Analysis?
Does the Buy American Act apply to Commericial Items under the SAT?
Does the Buy American Act apply?
Does the Buy American or Trade Agreement Act apply to Animal Procurements?
Does the Contractor get a copy of the QASP
Does the contractor get a vote in what can be evaluted during Government Performance Evaluation?
Does the contractors Quality Control Plan have to be on a CDRL
Does the cost of a contract have any determination on whether it needs to be entered into CPARS?
Does the customer reimburse the government for cost of First Article Test?
Does the DOD have a code respositiory
Does the Excessive Pass Through Clause apply to affiliates?
Does the FAR apply to an agreement for reimbursement of a foreign entity?
Does the fee on a convenience check count towards the single purchase limit
Does the FOC date change with the increase to AAO?
Does the Government allow profit or fee on indirect costs?
Does the government have to pay for services they did not receive on a FFP contract?
Does the Government have to provide parking for its onsite contractors?
Does the IT Box Solution still include RDP
Does the June 30, 2011 revised FAR 42.708 Quick-Closeout Procedure apply to contracts, task orders and delivery orders completed before June 30, 2011?
Does the M16A2 has a Life Cycle Replacement
Does the Phase-In Period, Services Contract, count towards the 5-year Limitation
Does the primary NAICS code on an IDIQ determine the vendors size standard for orders?
Does the Service Contract Act Apply?
Does the Test and Evaluation Master Plan TEMP need to be updated for an APB breach
Does the type of funding change the legality of adding construction requirements to an IDIQ service contract?
Does the use of a Government Warehouse Management System by itself make a requirement non-commercial?
Does the use of source control for components on drawings restrict competition?
Does the word Government in FAR 31.205-11 include state and local Governments
Does there need to be a MS-C ADM?
DOES THIS HAVE TO BE IDENTIFIED?
Does this meet the definition of qualifying proposal
Does Training apply to the SCA
Does Use of WAWF Supersede the Requirement to Pay for Micropurchases by GCPC?
Does vendor ever need to add a new NAICS code in SAM to be eligible for award?
Doing a Unilateral Mod when the Contractor will not sign bilateral
Dollar Limitation of Task Order Modification
Dollar Threshold to Determine if Post-Award is Required
Dollar value of modification
Dollar Value of the modification for additional funding
Domestic Non-availability determination DNAD or National Security Wavier
DON Budgeting Cycle with explanation
DON Independent Logistics Assessment Handbook, NAVSO P-3692
DON MATRIX OF FAR/DFARS AND OTHER GOVERNMENT-UNIQUE PROVISIONS/CLAUSES
DoN Probability of Program Success Training
Dose the Nonmanufacturer Rule waiver, either a class or individual waiver, permit a Small Business to supply the product of a non-domestic manufacturer?
DOT and GSA Airfare Costs
DOTMLPF-P
DO-TO against GSA Contracts to include Option Years
Double dipping
Double Sampling Plan Confidence Charts
Down-Select criteria for competitive prototyping?
DPAS Authority
DPAS for
DPAS Rating for a subcontract with a foreign entity
DPAS rating Part 700 Para 700.17 f
DPAS support and resources
DPAS Threshold When Combing Rated and Unrated Quantities
DPAS to what extent is the prime responsible?
Draft 1354 on military construction project
Draft Basis of Estimates - BOEs
Draft CDD, IOC dates feasibility with respect to POM
Draft DoD Source Selection Plan
Draft RFP before Milestone B Approval
DRAFT RFP prior to Justification and Approval
DRAFT RFP vs Synopsis Requirement
Drawing and part Number cited in contract VS. contractors Drawing and part number
DRAWING CHANGE CONTROLS?
Drawing Reviews
DRD sufficient for a MS C?
DRMO USE
Drug Free Workplace
DSOR and CDA Templates
DSS Cleared Facility Review and Contract Source Selection
DTE costs for a COTS Product?
DTM 09-016 SCRM
DTM 10-015 Requirements for Life Cycle Management and Product Support
Duns numbers
Duplicate contracts
Duration of a Purchase Order
Duration of a single and multiple award IDIQ
During Source Selection, if an Offeror failed to address a requirement is it considered a weakness or a deficiency?
DX RATINGS
EACs and Contract Period of Performance Terms
Eagle Cash Card in place where GPC card is not used
Eample of a Seventy five percent letter. Limitation of Funds
Early Award of a Task Order
Early Closeout of IDIQ Delivery Orders Containing FAR 52.216-8
Early Contract Closeout
Early Exercising of Options
Early Notification to Unsuccessful Offerors in a Total Small Business Set-Aside
Early Operational Assessment
Early Operational Capability Definition
Early Program Close-out/termination
Early progress payments
Early Review of Submitted Offers
Earned value - negative control accounts
Earned Value Management
Earned Value Management
Earned Value Management application for IDIQ Contracts
Earned Value Management Compared to a PBL Public-Private Partnership
Earned Value Management Waiver
Earned Value: Completion vs. Term contracts
Easy One: Definition of Certifying Official
Ebay as a buying source
ECD and Beneficial Occupancy
Echelon 2 maintenance
Economic Analysis Update for Full Deployment Decision Review
Economic Price Adjustment
Economic Price Adjustment
Economic Price Adjustment
Economic Price Adjustment Clause DLAD 52.216-9030
Economic Price Adjustments and Earned Value Data
Economy Act
Economy Act
Economy Act - Price or Cost Analysis in support of a Determination and Findings memo
Economy act acquisitions
Economy Act applicable to FMS-funded contract support?
Economy Act D & F in addition to Limited Source Justification
Economy Act Determination and Finding
Economy Act Determination and Finding Process Flow
ECONOMY ACT ISSUE
Economy Act Order accepted as a Project Order
ECONOMY ACT ORDER NC2276A 51-49 PERCENT RULE CLARIFICATION
ECP due to latent defect
ECP to Joint Program Requirements
Edarts and LOAs
EDFP and PPL Info
Education and Training Service Contract Act (SCA)
Educational Institution Salary Certification
Educational Service Agreement
Educational Service Agreements and Representations and Certifications
Educational Services
EEICs Mapped to PSCs
EEO Certification Requirement
EEO Pre-Award Clearance
Effect of a Differing Site Condition on an A/E Contract
EFFECT OF LOCATION OF CONTRACTOR BOOKS AND RECORDS ON COGNIZANT CAO
Effective Contract Management in MK Romania
Effective Contract Management in MK Romania
Effective Contract Management in MK Romania
Effective Contract Types
EFFECTIVE DATE
Effective VS Signed Dates
Effectiveness of Contractor Incentive Structures
Efforts to Demonstrate Adequate Competition
EIAC and EIC
EIC GNQ
Eichleay
Eichleay Clarification
Electric utility contract subject to CPARS?
Electrical Power Distribution
Electronic or Email CCB
Electronic response
Electronic Serviceable Tags
Electronics Installation Site Survey
Elements of ILS
Elevator Repairs
Eliminating Proposals
ELIN PRICED CDRL
ELIN/CLIN Numbering Format
EMAIL CDRLS
Emailing Aquisition or Program Sensitive information
Embassy fund cites
Embedded Services
EMD Deficiencies
EMD Phase
Emergency contracting
Emergency Funding
Emergency purchase withithout ITAS waiver
EMERGENCY PURCHASES AHEAD OF ACCEPTED FUNDING DOC
Emerging Small Businesses
Employee Housing Assistance Incentive Program (vs Donation)
EMTOE Help
Enabling/Critical Technologies
End Item Map
End of Contact
End of Life Cycle Management
End User Certificate
End User licensing agreement (EULA)
Enduring Requirements and Endless FOC Quantities
EnergyStar appliances mandated?
Enforceability of Contractor Terms Stated in the Proposal
Eng Svcs on a C type contract Stand alone or Over Arching ESM PWS and CDRLs
Engaging in a contractors hiring process
Engineering and Scientist Exchange Program
Engineering Change Proposals
Engineering Change Proposals
Engineering Review timeline
Engineering Services budgetary discriminators
Engineering Services IDIQ Contracts Completion Form
Engineering Specs and Statements of Work
Enhanced Competition Requirements concerning Multiple Award Contracts
Enhancement Color of Money
Ensuring the Use of the Correct Specification Revision Level
Enterprise Software License Acquisition
Enterprise Systems Data Rights
Entrance Criteria for Full Deployment?
Environmental Life Ratings
EPLS and Purchase Card
EPLS debarrment verification requirements
EPLS for Quotes
Equal low bids, not sealed bidding
Equal proposal on a 15.101-2 Lowest price technically acceptable acquisition
EQUAL QUOTES
Equipment Authorizations
Equipment Estimated to Exceed Investment Threshold Instead Costs Less Than Threshold
Equipment Exempt from Spectrum Certification
Equipment Incidental to Performance
Equipment Lease and Consumables
Equipment screening threshold
Equipment upgrade at zero cost
Equipment with service
Equitable adjustment
Equitable adjustment
Equitable Adjustment - Proposal Costs for a Follow-on that Changed Contract Type
Equitable Adjustment for Service Contract
Equitable argument for denying storage costs
Equitable Price Adjustment
Equitable Price Adjustments
Equivalent SLOC Formula questions
ERRC code N items
Erroneous Award on FBO
ERROR IN FEE AWARDED ON A CPFF CONTRACT
ESCALATION
Escalation
Escalation and Service Contract Act Labor
Escalation Application
Escalation on GSA Schedule Labor Rates
Escalation Proposed on DoL Wage Determined Rates/Categories
Escalation Rate for Multi-year Contract
ESM Definition
ESRS
eSRS and FMS contracts
eSRS and ISRs
eSRS reporting
Establish Over and Above line items at time of contract award or when work requests are authorized
Establishing a BPA
Establishing a BPA
Establishing a BPA for FMS case that is exceeding $2,500 per year cell phone threshold
Establishing a Non-Appropriated Funds Instrument
Establishing a set price
Establishing accountability on GFP
Establishing BPA using FAR Part 8 and issuing a call order with the solicitation
Establishing BPAs
Establishing BPAs against GSA GWACs
Establishing multiple BPAs
Establishment of a Project Office
Establishment of Designated Personnel
Establishment of Designated Personnel
Estimated below SAT but OEMs offer makes PR a large buy
Estimated quantities
Estimating How Much Liability Insurance is Need on a 5 Billion Dollar Project
Estimating the cost of reliability testing
Ethics
Ethics and Legalities with contractors inspecting other contractors/COR responsibilities
Ethics or law issue
E-Tools
EV budget for POP extension
EV on a FFP CLIN
Evaluated Receipt Settlement
Evaluatiing past performance and LPTA source selection procedures
Evaluating a Cost Reimbursable No Fee - CRNF - CLIN
Evaluating Contract Type during Source Selection
Evaluating Cost Separately from Technical Factors
Evaluating FAR Clause 52.217-8 in the Total Evaluated Price
Evaluating Past Performance for a Lowest Price Technically Acceptable
Evaluating Price-FFP Contract
Evaluating proposals from GSA schedule holders
Evaluating proposals- Prime teams up w another company -no Joint Venture
Evaluating Quotes
Evaluation criteria
Evaluation Factors
Evaluation of Commerical Items
Evaluation of proposals
Evaluation of proposals
Evaluation of Termination Clause
Evaluation Rating Scheme for Small Business Participation Factor
Evaluation Scoring
Evaluation Weakness
EVALUATIONS OF PROPOSALS
Evalution of Propodals
Event or Schedule Driven Acquisition
EVM - CV vs. CV percent
EVM - Is contractor allowed to give a work package or task a baseline finish date after the Contract End date?
EVM - TCPI
EVM and overhead/rates issues
EVM DFAR Reporting Requirement
EVM on IDIQ contract where orders are less than twenty million
EVM Tripwires
EVM Use of Undistributed Budget
EVMS - Reduction of Period of Performance for PMB Element
EVMS and overrun
EVMS and wInsight
EVMS Requirements and Research and Development Contracts
EVMS requirements prior to 2005
EVMs/IBRss When Major Sub-Contractor is Foreign Company
Example Life Cycle Logistics Documents
Example of a Systems Spec, particularly Section 4 VCRM
Example of an Office of Primary Responsibility memo
Example of Component Head
Example of Cost reimbursable and firm fix price incentive contract
Example or template for a Justificaiton and Approval to add the 52.217-8 clause
Example Risk Management Board
Examples of DoDAF 2.0 viewpoints
Exceeding estimated quantities on Requirements Contracts
Exceeding Maximum Ordering Limitation
Exceeding procurement documentation quantities
Exceeding Requirements Type Contract Estimate
Exceeding the 10 percent statutory maximum on CPFF sole source contracts
Exceeding the award value of a FFP Construction Contract
Exceeding the BEQ
Exception to SAM Registration for Previously Registered Contractor
Exception to synopsis of proposed contract action - 5.202
Exception to synopsizing for oral solicitations
Exception to the Bona Fide Needs rule at year-end
Exceptional Circumstances??
Exceptions to Contractor Quote/Proposal
Exceptions to SAM Registration
Exceptions to the 15 day SBA review
Exceptions to using DLA
Excercise Option
Excersizing ACOs and PLCOs by processing transfers through PCARSS
Excess Funding
Excess funds
Excess Funds remaining on Purchase Order
Excess Material
Excess Profit
Excessive Pass Through - No Value Added
Excessive pass through charges on a cost no fee contract
Exchange of Equipment Purchased with Different Funds
Exchange of Personal Property
Excluding vendors from proposing
Excusable Delays for Construction
Execution After Contract Ends
Execution of Options
Execution of RDTE Funds with a CPD
Executive Agent vs Joint Program Office
Executive Compensation CAS 401 N/C?
Executive Compensation Limit Adjustments
Executive Order EO 13706 Implementation
Exemption to Small Business Set-Aside over SAT
Exemption to Synopsizing