Sign In
Content Type

All

DAU AAP

 

 

Production completed by prototype facilities2200602/27/2021 1:44:26 AMProduction, Quality, and Manufacturing; Other it can be a viable way to execute a production program as long as the facility can sign up https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Low Rate Initial Production (LRIP)2206722/27/2021 1:53:59 AMProduction, Quality, and Manufacturing exceeding 10 percent of the total production quantity consist of, a business case analysis https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Quality requiremets for Non-developmental Items (NDI)2202292/27/2021 12:55:42 AMProduction, Quality, and Manufacturing Since FAR 52.246-2 is in the contract doesn't the contractor have to follow the FAR when dispositioning non-conforming material even if it https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Quality assurance and control for service contracts 2195782/26/2021 7:32:54 PMIf all three clauses in a cost reimbursement type The question I have pertains to the quality assurance provision included in most of these Production, Quality, and Manufacturing https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Cost Vouchers and Receiving Reports2207702/27/2021 12:25:31 AMWe have been instructed by the FIRM that when this clause is present, ALL CLINS on the contract will require a receiving report, whether they Production, Quality, and Manufacturing https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Compliance versus Intent3833802/27/2021 1:42:04 AMProduction, Quality, and Manufacturing We have chosen to model our QMS after AS9100C and feel we meet the intent of the specification; however, we are being audited by the https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Special Tooling - Special Test Equipment - Electronic Counterfeit2193842/26/2021 7:24:18 PMDo the requirements associated with the procurement of can be integrated into "non deliverable" manufacturing devices such as special tooling Production, Quality, and Manufacturing https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Damaged government equipment held at a contractors facility1887242/27/2021 1:32:17 AMTest and Evaluation; Production, Quality, and Manufacturing What do we have to do, as the Government in regards for a disposition of this trailer being a total loose with no value https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Source Approval Request subsequent testing funding types5476262/26/2021 6:20:14 PMTest and Evaluation; Production, Quality, and Manufacturing; Life Cycle Logistics I am wondering who is supposed to be responsible for the cost of the Government testing of SARs https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse
Request For Deviation RFD for Alternate Material2200932/27/2021 12:25:31 AMIs a Request For Deviation an appropriate mechanism to request permission to use an alternate material to that specified on a drawing or Production, Quality, and Manufacturing https://www.dau.edu/aap/Lists/AAP Published Questions/AllItems.aspxFalse

Chat with DAU Assistant
Bot Image