Sign In
  • Question

    Should DCMA insist that a Contractor Inspector review the Test Report and affix a square stamp if he finds the Test Report acceptable?


    Answer

    The 1423 SS code for the DD250 means acceptance and inspection at source.  Yes, have the Contractor follow their written procedures they have in place and submit the Test Report as required. 

    Open full Question Details