Sign In
Content Type

All

DAU Acquipedia

 

 

Full-Rate Production Systems2890653/4/2022 10:07:41 AMContinuation into full-rate production results from a successful Full-Rate Production Decision Review (FRPDR) by the MDA or his Production, Quality & Manufacturing https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClass5E091A9FCDAE4F2C9A2151D974FB225D"><span style="font-size&#58;16px;background-color&#58;#ffffff;">The second effort of the Major Capability Acquisition (MCA) pathway's Production and Deployment (P&amp;D) phase defined and established by DoDI 5000.85. This effort follows a successful Full-Rate Production Decision Review (FRP DR). The system is produced at rate production and deployed to the field or fleet. This phase overlaps the Operations and Support (O&amp;S) phase since fielded systems are operated and supported (sustained) while Full-Rate Production (FRP) is ongoing.</span><br></div>
Physical Configuration Audit (PCA)2877323/3/2022 7:39:27 PMof whether the contractor or the government controls the detail production design Life Cycle Logistics Production, Quality & Manufacturing Program Management Information Technology https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClassB4F1581704FC4F10B63C2D5A86F42680">Physical examination of the actual configuration of the item being produced. It verifies that the related design documentation matches the item as specified in the contract. The system product baseline if finalized and validated at the PCA.</div>
Production Representative Articles/System2874553/4/2022 10:06:11 AMProduction Representative AIM-9X Scores Direct Hit F-35B arrives at Pax and production representative F-35A first flight Production, Quality & Manufacturing https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClass283EA0F3D6574FE0AE3D360C48A96AB1">A system whose hardware and software defined by system-level critical design review, functional configuration audit, and system verification review, including correction of major deficiencies identified during prior testing. For hardware acquisitions, production-representative articles should be assembled using parts, tools, and manufacturing processes intended for use in full-rate production, utilize intended production versions of software, and all operational logistics systems for use on fielded system should be in place. Manufacturing processes to be used in full-rate production should be adhered to as closely as possible. For software acquisitions, a production-representative system consists of users performing operational tasks with hardware and software intended for deployment, in an operationally realistic computing environment, with representative DoD information network operations and supporting cybersecurity capabilities. All life-cycle system support should be in place.</div>
Systems Engineering in Production and Deployment2873293/3/2022 7:39:40 PMPQM 101 Production, Quality and Manufacturing Fundamentals ENG 101 -- Fundamentals of Production, Quality & Manufacturing Systems Engineering In this phase of the acquisition life https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClassD642E5A8BD78416C90537B832EC67D58">An interdisciplinary approach and process encompassing the entire technical effort to evolve, verify and sustain an integrated and total life cycle balanced set of system, people, and process solutions that satisfy customer needs. SE is the integrating mechanism for the technical and technical management efforts related to the concept analysis, Materiel Solution Analysis (MSA), Engineering and Manufacturing Development (EMD), Production and Deployment (P&amp;D), Operations and Support (O&amp;S), disposal of, and user training for systems and their life cycle processes.</div>
Functional Configuration Audit (FCA)2874643/3/2022 7:39:23 PMThe accuracy of the documentation reflecting the production design Life Cycle Logistics Production, Quality & Manufacturing Program Management Information Technology https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClass5743B4169239455F93D9A6125507A33A">The formal examination of functional characteristics of a configuration item, or system, to verify that the item has achieved the requirements specified in its functional and/or allocated configuration documentation.</div>
Systems Engineering in Engineering and Manufacturing Development Phase2880223/3/2022 7:39:40 PMAcquisition Guidebook (DAG) CH 3–3.2.4 Engineering and Manufacturing Development Phase in Engineering Defense Systems PQM 101 Production, Quality and Manufacturing Fundamentals https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClass76B3DCA7EC8B4930BB676BF4B912A09C">An interdisciplinary approach and process encompassing the entire technical effort to evolve, verify and sustain an integrated and total life cycle balanced set of system, people, and process solutions that satisfy customer needs. SE is the integrating mechanism for the technical and technical management efforts related to the concept analysis, Materiel Solution Analysis (MSA), Engineering and Manufacturing Development (EMD), Production and Deployment (P&amp;D), Operations and Support (O&amp;S), disposal of, and user training for systems and their life cycle processes.</div>
Product Support Analysis (PSA)2880694/5/2022 4:57:16 PMTechAmerica Standard TA-STD-0017 Product Support Analysis MIL-Handbook-502A Product Support Analysis US Army Logistics Support Activity (LOGSA) PowerLOGJ Tool US Army https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse
Provisioning2881036/8/2022 7:26:16 PMMIL-STD-3018, Parts Management SD-19 Parts Management Guide SAE GEIA-STD-0007 Logistics Product Data MIL-HDBK-502A Product Support Analysis DoD Manual 4140.01-Volume 2 https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClassE2F8AF3B8434420C861B60D097BBF2A2">The process of determining and acquiring the range and quantity (depth) of spares and repair parts, and support and test equipment required to operate and maintain an end item of material for an initial period of service. Usually refers to first outfitting of a ship, unit, or system.</div>
Quality 2878643/4/2022 10:05:22 AMB) PQM 301 Advanced Production, Quality, and Manufacturing Fundamentals CLE 004 Introduction to Production, Quality & Manufacturing Program Management Systems Engineering https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse<div class="ExternalClassE29DCE15486C4625B86117020252E0E3">The composite of materiel attributes including performance features and characteristics of a production or service to satisfy a customer's given need.</div>
Cataloging2879383/17/2022 3:29:00 PMPart A PQM 201B Intermediate Production, Quality, and Manufacturing, Part B PQM 301 Advanced Production, Quality, and Manufacturing DAU Continuous Learning Modules https://www.dau.edu/acquipedia/Lists/Acquipedia Article/quick.aspxFalse

Chat with DAU Assistant
Bot Image