High Volume Fly Ash Concrete
Execution of this project will extend the service life of the Navy Submarine Base at Bremerton replacement pier project structure to 75 years. This is a significant reduction in funds and downtime necessary to replace/repair the structure if it were constructed with a standard concrete mixture.