Skip Ribbon Commands
Skip to main content
 
      

Design

Once a decision is made to construct a facility and funds are available, a detailed design of a project generally begins. Through the process, a preferred design approach develops and matures into final construction documents. Design actions may be contracted out or performed in-house. The materials, technologies, and types of systems chosen during this function have a direct and life-long impact on the costs to operate, maintain, repair, and dispose of the facility.


  
  
  
  
  
There are no items to show in this view of the "DAU Sponsored Documents" document library.