Skip Ribbon Commands
Skip to main content
 
      

Design

Once a decision is made to construct a facility and funds are available, a detailed design of a project generally begins. Through the process, a preferred design approach develops and matures into final construction documents. Design actions may be contracted out or performed in-house. The materials, technologies, and types of systems chosen during this function have a direct and life-long impact on the costs to operate, maintain, repair, and dispose of the facility.


  
  
  
  
  
There are no items to show in this view of the "DAU Sponsored Documents" document library.
Bot Image