Skip Ribbon Commands
Skip to main content
 
      

Skip Navigation LinksFAQs

Answer
Topic Area
  
  
Edit
expand Question : Aren t there required DoD product support metrics ‎(1)
expand Question : As a follow-up to the above question, is Life Cycle Logistics Level III DAWIA certification sufficient to serve as a PSM ‎(1)
expand Question : at about incentivizing performance What should I consider when selecting performance incentives ‎(1)
expand Question : But isn t the Program Manager PM ultimately responsible for PBL implementation ‎(1)
expand Question : Can someone from industry - a support contractor serve as a DoD PSM ‎(1)
expand Question : Can the PSM and the PSI be one and the same person or come from the same organization ‎(1)
expand Question : Can there be more than one PSI ‎(1)
expand Question : Can these top-level life cycle sustainment outcome metrics be put on contract or should we use tailored lower-tier metrics ‎(1)
expand Question : Do the PSM s product support responsibilities extend to fielded systems or programs that are out of production e.g., post Milestone C and - or which no longer have a formal Acquisition Category ACAT designation assigned ‎(1)
expand Question : DoD and DAU very often interchangeably use the terms Performance Based Logistics, Performance Based Life Cycle Product Support, and the PBL acronym. Are these terms synonymous ‎(1)
expand Question : Does it make any difference whether the PSI is a DoD entity or an Industry entity ‎(1)
expand Question : DTM 10-15 mentions specific responsibilities related to conducing a Business Case Analysis BCA . Is there additional information and guidance related to performing a product support BCA ‎(1)
expand Question : Haven t we always had someone, or an organization, responsible for the integration of product support, i.e., a PSI without the nomenclature ‎(1)
expand Question : How can an industry PSI manage DoD workers, or vice versa, in accomplishing the integration of product support ‎(1)
expand Question : How can I execute a long-term PBL contract when there is so much budget uncertainty ‎(1)
expand Question : How do colors of funding affect PBL contacts ‎(1)
expand Question : How do I select performance metrics Or what constitutes a good performance metric ‎(1)
expand Question : How do Product Support Arrangements PSA differ from or align to Performance Based Agreements PBA ‎(1)
expand Question : How do warranties from industry differ from a PBL arrangement ‎(1)
expand Question : How is workload allocation determined when implementing a PBL product support strategy ‎(1)
expand Question : How much time do Product Support BCAs generally take to prepare - complete ‎(1)
expand Question : I keep hearing about colors of money. What does this term mean ‎(1)
expand Question : I ve heard of something called SMART metrics. What are they ‎(1)
expand Question : If operational requirements change, can I reduce the required level of performance I m paying for from the PSP e.g., a readiness rheostat ‎(1)
expand Question : If PBL program pricing history is not available, then what contract type is recommended ‎(1)
expand Question : Is it wrong for a PSP to realize a profit margin that may be perceived as or seem to be excessive outside the program office ‎(1)
expand Question : Is the PSM required to report directly to the Program Manager PM ‎(1)
expand Question : Is the role of PSP limited to private sector companies ‎(1)
expand Question : Isn t PBL just contractor logistics support by a different name ‎(1)
expand Question : It seems that most PSIs are from industry, and most of those seem to be the Original Equipment Manufacturer OEM . So does assignment of a PSI signify outsourcing of sustainment to industry ‎(1)
1 - 30Next