This area shall contain information on process design and control related areas to include:

Process Capacity:

  • Availability, Quantity, Rate and Lead-Time

Process Characterization:

  • Key Fabrication Characteristics:
    • Process Cability, Process Proofing & Materials Characterization Data
  • Key Assembly Characteristics:
    • interface Control

Operations Management:

  • Quality Management System
    • Process Documentation
    • Inspection
    • Statistical Control
    • Non-Destructive Test
  • Environmental Management System
  • Shop Floor Planning and Control
  • Subcontractor Management
  • Tool Control
  • Preventive Maintenance
  • Purchasing
  • Product Data Management 

Note: The inclusion of related websites is provided as an initial list of sources of potentially valuable information.  These links are not inclusive and are not intended to endorse any individual website. 

  
  
  
  
  
Counterfeit Parts Web Site.aspx
  
Reference4/5/2017 3:13 PM
ISO 9000 - 2005 Fundamentals and Vocabulary.aspx
  
Reference5/12/2015 6:02 PM
ISO 9000 History and Terminoloy.aspx
  
Reference5/12/2015 6:02 PM
Extreme Manufacturing 720751.doc
  
Reference5/5/2015 6:31 PM
PRR Technical Guide.doc
  
Reference1/6/2014 2:41 PM
Manufacturing Planning.aspx
  
Reference8/22/2013 11:39 AM
Manufacturing Strategy.aspx
  
Reference8/22/2013 11:36 AM
MIL STD 881C1.pdf
  
Reference11/7/2011 3:20 PM
GAO Report of Space and Missile Defense Acquisitions.aspx
  
Lessons Learned8/15/2011 1:39 PM
Manufacturing Insecurity.aspx
  
Case Study7/7/2011 11:08 AM
A Framework for Revitalizing American Manufacturing.aspx
  
Reference5/2/2011 11:12 AM
Thoughts on American Manufacturing Decline and Revitalization.aspx
  
Reference5/2/2011 11:09 AM
Manufacturing Industry Study.aspx
  
Case Study10/7/2010 11:28 AM
National Summit Unveils America s To Do List.aspx
  
Case Study8/25/2010 10:27 PM
Counterfeit Parts.aspx
  
Lessons Learned7/19/2010 8:20 AM
GAO Report GAO-10-439 - DoD Can Achieve Better Outcomes by Standardizing the Way Manufacturing Risks are Managed.aspx
  
Lessons Learned7/7/2010 12:14 AM
GAO08782T  Better Weapon Program Outcomes Require Discipline Accountability and Fundamental Changes in the Acquisition Envi.aspx
  
Lessons Learned1/31/2009 11:45 AM
GAO-08-619 - A Knowledge-Based Funding Approach Could Improve Major Weapon System Program Outcomes.aspx
  
Lessons Learned1/31/2009 11:43 AM
GAO-08-804 - Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget.aspx
  
Lessons Learned1/31/2009 11:41 AM
GAO-08-1159T - Fundamental Changes Are Needed to Improve Weapon Program Outcomes.aspx
  
Lessons Learned1/31/2009 11:38 AM
GAO Report  Increased Focus on Requirements and Oversight Needed to Improve DoD s Acquisition Environment and Weapon System.aspx
  
Lessons Learned1/31/2009 11:34 AM
Draft SETR Inst 4355.19D w1 18 10Aug07.doc
  
Reference1/23/2009 8:12 PM
GAO Study 02 701 79.pdf
  
Case Study1/23/2009 8:09 PM
INDUSTRIAL ENGINEERING ASSESSMENT MANUAL.doc
  
Reference1/23/2009 8:07 PM
Quality Management Roadmap Ver 1 0 14 Apr 05.doc
  
Reference1/23/2009 8:04 PM
USD ATL LCM Framework Memo 31 JUL 08.pdf
  
Reference9/9/2008 10:38 AM
GAO Report on the Expeditionary Fighting Vehicle.aspx
  
Case Study9/9/2008 10:33 AM
NASA Systems Engineering Processes and Requirements.aspx
  
Reference2/26/2008 3:47 PM
Metrics that Matter.ppt
  
Learning Material10/2/2007 1:09 PM
measuring the unmeasurable.pdf
  
Learning Material10/2/2007 1:06 PM
1 - 30Next