  • earned value management system

    Industry-developed set of 32 standards adopted for use by DoD in 1996 for evaluation of contractor management systems. The EVMS replaced the Cost/Schedule Control Systems Criteria (C/SCSC), which contained 35 standards for evaluation of contractor management systems. Contractors with systems formally recognized by DoD as meeting the 35 C/SCSC standards prior to November 1996 are considered compliant with the 32 EVMS standards.